Loading...
Callahan-LR021030FAROO CONBULTANTB, INC. DAILY FIELD REPORT Tested For: Bonner Associates Project Name: Callahan Addition Coppell, Texas Weather /Temperature: Cloudy / 60-65 (F) 11440 Reeder Rd. • Dallas, TX 75229 Tel. (214) 352-4100 • Fax (214) 352-4811 Date Performed: 10-30-02 FCI Project No.: M02-412 The Fargo technician traveled to the above referenced site as requested to perform field testing. Upon arrival, compaction of fill was in progress. However, the southern approximate one- half of excavated area was still too wet to achieve the proper compaction as determined by several density/moisture tests. Tests were conducted for the purpose of contractor information only and were not reported. Mr. Barnes informed the technician that he would call tomorrow morning for field density testing. T. Barnes was informed of all observations. At the completion of the scheduled testing, the technician returned to the office. Technician: Dan Rotty, EIT Respectfully Submitted, Fargo Consultants, Inc. Environments/ Services / Geotechnica/ Engineering ^ Construction Materia/s Testing