Loading...
ST9502-CS 960522 HE~Y-22-96 NED 13: 39 ' P. 0 ! ~f') g.I'2"E C02VCREZI'E, INC ' '~T~ 5'~L, ....... . .... ,: Per your request, we have mapped the pond with regards tO existing water and silt levels. After mapping the pond and considering various options to reduce the water level and isolate the existing headwall for connection, we believe this task can best be achieved by constructing a temporary earth cofferdam. This cofferdam will be constructed as near to the outfall of the exiting headwall as is reasonable to allow for work space. Due to this construction, we are anticipating a need to repair and/or replace some existing landscape features. These may also include repairs to existing underground sprinkler system in the area. we will take measures to minimize any damage to these features while also performin~ the work in a manner no provide the shortes~ possible disruption to the homeowners and the pond itself.