Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Primrose-CS 950404
__n - ~~/ the City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 April 4, 1995 Teri Jones Dowdy Anderson & Associates 16250 Dallas Pkwy. Suite 100 Dallas, Texas 75248 RE: Primrose School Development Fee Assessment Dear Mr. Jones: REVISED ~~~ P.O. Box 478 Coppell, Texas 75019 214-462-0022 Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Primrose School. Please make payment to the City of Coppell in the amount of 7 875. and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, ~~ Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer cc: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager CITY OF COPPELL ` DEVELOPMENT FEES Date: April 4, 1995 Project : Primrose School TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 5,625.00 5,625.00 (100% due prior to Council Approval) Water Tap Inspection Fee 300.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 2,250.00 2,250.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee N/A N/A (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 129.05 (100% due at Issuance of Water Meter) Water Meter Deposit 70.00 (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 1,454.55 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee N/A N/A (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow N1A N/A (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 9,913.60 $ 7,875.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. v DATE: March 21, 1995 COPPELL ENGINEERING MEMORANDUM ~~51 ~~ TO: Mike Martin, E.I.T. j FROM: Howard Pafford, Utilities Superintendent ~~~° RE: Development Fees for Primrose School The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 1 1/2" Domestic Meter/s = 5 ESU's 1 - ~1/2~" I~i~tion Meter/s = ~ ESU's ~- Total _ 1(e~•7 ESU's @ $450 .00 ea = 59~8-~8-~ S~ (~ ~- S • ~d 100 due prior to Council approval of the final plat. Wastewater Impact 1 - 1 1L2" Domestic Meter/s = 5 ESU's Total 5 ESU's @ $450.00 ea = 52,250.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3~ Connections @ $100.00 each = S2-B9.00 ~~ 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Utility Final Inspection Fee (AII Development) 1 lot @ 550.00/Iot = 550.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 1 1/2" Domestic Meters @ 5129.OSea = 5129.05 I00% due prior to issuance of building permit for residential only. All other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation~f-c~~--) 1 - 1 1/2" Irrigation Meter/s ' @ 5129.05 ea = ~ 5129.05 _._L- - (~, `` f e ~~.-E-e r' F ~ ~ t~ 3 ~-5 . so _- ~ 3 a s, So ' 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) Meters @ 535.00 ea = S~?k90 105. ©o 100% due prior to issuance of water meters.