ST0102-MP030804 RUBY ROAD ST O1-02 Pacheco Koch Consulting Engineers ~ i 2(301 Qtr 4. 2001 ID ~ Task Name ----~- ........ T' -- --T 1 :~ DESIGN PHA~E 3 -'~ Advedisement 4 Bid Opening 5 -~, Ci~ Council 6 UTILITY RELOCATIONS 7 Oncor Electric & Gas 8 , Verizon / GTE 9 ~ TESTING MATERIALS 10 Rone Engineers 11 Contract Execut~ 12 CONSTRUCTION 13 ~ Pr~onstruction Meeting 14 ~ Notice to Proc~d 15 ~ Construction (work days) 16 ~ Construction (Over) Qtr 1.2(302 · 10128 · 11 Qtr2,2002 Qtr3.2002 Qtr4.2002 Qtrl 2003 ~Qtr2,2003 Qtr3 2003 1212 Project: ST 01-O2 Task Milestone · Summary ~ Deadline Date: Mon 8/4/03 Page 1 RUBY ROAD ST O1-02 Pacheco Koch Consulting Engineers 7 15 Oncor Electric & Gas 10-07-02 Jim Phillips said the relocations would start in early November. Requested trees to be removed prior to the relocation to expediate the relocation. November 7, 2002 - relocation staked, poles will be 2 feet south of right-of-way. Construction (work days) WEEK 1 (Dec. 16 - 20) Installed approximately 450 feet of the 8-inch sewer line. Completed 50% of all clearing and grubbing. WEEK 2 (Dec. 23 -27) Completed the installation of the 8-inch sewer line. Began installetion of the 12-inch water line. WEEK $ (Dec. 30 - Jan. 3) installed approximately 1500 linear feet of the 12-inch water line. Uncovered the existing water line along Coppell Road. WEEK 4 (Jan. $ -10) installed the water line under the existing Verizon line on the west end of the project. Installed fire hydrants and set meter valves and boxes. Worked on excavation and fill and the installation of the 54- inch storm drain. WEEK $ (Jan. 13-17) Worked on the installation of the storm drain. WEEK 6 (Jan. 20 -24) Finished the installation of the 12" water line, etubouts, and fire hydrants. Installed the 30" and 36" storm drain pipes and the 18" laterals. 95% of the asphalt and base removal of the existing road is complete. WEEK 7 (Jan, 27 -31) installed 54" storm drain. Installation of all of the storm drain is complete for Phase I. installed the 5'x~ box culvert and worked on placement of fill material. Preparing roadway for lime stabilization. Received a complaint from the trailer park concerning rebar in the landscaping, trash, and the trailer park sign. WEEK 8 (Feb.03 - 07) Completed the 12" water line testing. Took samples. Preparing roadway for lime stabilization. WEEK 9 (Feb.11 -14) Water line samples passed. Started on the Phase I inlets. Type B manhole and headwall poured. AT&T cable still on utility poles. Met with represetatives from AT&T and they will start relocation as soon as possible. WEEK 10 (Feb. 17 -21) AT&T cable removed. Oncor poles not removed yet. Contractor asking for additional time. Retesting of failed densities. Rain. WEEK 11 (Feb.24 -28) Ice. WEEK 12 (Mar. 03-07) No work. WEEK 13 (Mar. 10-14) Oncor pulled the utility poles. Contractor lime stabilized the roadway. WEEK 14 (Mar. 17-21) Contractor remixed the lime stabilization. Took densities on the 21st. WEEK 15 (Mar. 24-28) Some of the densities failed, Started paving on the 27th. Paved one-half of Phase I. WEEK 16 (Mar. 31-Apr.4) Paved the other half of Phase I. WEEK 17 (Apr.7-11) Poured six inlet tops. WEEK 18 (Apr. 14-18) Poured inlet throats - sealed the sawed joints -installed traffic buttons WEEK 19 (Apr. 21 - 25) Worked on the demolition of Phase Il. Installed the asphalt temporary roadway. Made the traffic switch on the 21. Put up the signs. WEEK 20 (Apr. 28. May 1) Worked on the excavation of Phase II. WEEK 21 (MAY 5 - 0) Started the installation of the 27" storm drain. Added additional asphalt on the temporary drive because of standing water. WEEK 22 (MAY 12 - 16) Poured three inlet bottoms - finished storm drain. Set last fire hydrant. Killed old 4" water line and abandoned existing sewer line. Painted fire hydrants. Page 2 RUBY ROAD ST 01-02 Pacheco Koch Consulting Engineers WEEK 23 (May 19 - 23) Removed temporary asphalt drive, Inspector had them replace the drive so that occupant coutd access property. Worked on the mixing of the lime stabilization. WEEK 24 (May 26 - 30) Work on the lime stabilization process and took densities. WEEK 25 (June 2 - 6) Paved the eastbound lanes of traffic. WEEK 26 (June 9 -13) Contractor paved the westbound lanes of traffic. All paved except for three drive approaches and the leave-out in front of the single residence, WEEK 27 (June 16 -20) Poured inlet throuts, Sawcut joints. WEEK 20 (June 23 -27) Made tie-ins to existing drives at single residence. Installed traffic buttons. WEEK 20 (June 30 -July 4) Opened roadway for traffic, WEEK 30 (July 07 -11) Started hydromulching the parkway. WEEK 31 (July 14 - 10) Continued the hydromulching on the parkway, WEEK 32 (July 28 - Aug.1) Watered the hydromulch on the parkway, Page 3