Loading...
Freeport NIP(7.6)-CS030806August 6, 2003 Sean McMahon McMahon Contracting, Inc. PO Box 153086 Irving, TX 75015 -3086 RE: Second Notification of Repairs Maintenance Bond Freeport North Extension Dear Sean: The attached letter was sent to John Capko of your company on July 17, 2003. A decision was made last year to postpone paving repairs due to construction conflicts in the area. Those conflicts are no longer an issue, therefore, the paving failures that existed at that time and those that have occurred in the interim still need to be corrected. The area of the repairs is from Creekview Drive to Bethel Road. According to the maintenance bond covering this work, the deficiencies must be corrected in a timely manner and in accordance with City of Coppell inspection standards. This is the second notice to your company regarding repairs to be done under the terms of the maintenance bond. The third notice will go to the company that issued the bond. Please contact me at 972 304 -3684 immediately so that I can arrange to have the necessary pavement marking done prior to your crews beginning the repair work. Larry Davis Construction Inspector Office: 972 304 -3684 Fax: 972 304 -3570 Attachment: letter to John Capko T H E •C 1 T Y •O F COPPELL cc: Ken Griffin, Director of Engineering Glenn Hollowell, Director of Public Works Rhonda Brothers, Engineering Secretary Mike Cox, Duke Construction Jeff Langston Duke Construction 255 PARKWAY P.O. BOX 478 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673