ST9502-CS 960419P.O. Box 478
Coppell, Texas 75019
214-462-0022
April 19, 1996
Tim West
Wendy's International, Inc. / FAX (214)541-0179
4545 Fuller Dr., Ste. 404
Irving, TX 75038
RE: Wendy's / East-West Spine Road
Final Acceptance
Dear Mr. West:
A final inspection of paving and utilities for the referenced project has been confumed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
~inco4~~D&pecto=(~~
cc:
Robert Farrow, North Texas Contracting, Inc.
Jim Koch, Pacheco Koch Engineers
Bill Anderson, Dowdey Anderson Engineers
Kenneth M. Griffin, P.E., ACM/City Engineer
Utilities Superintendent
Street Superintendent
Greg Jones, Chief Building Official
Jeff Jones, Fire Marshal
Doug Stevens, Engineering Technician
file/ldavis/0finalac. ltr