August 8, 2003
Robert W. Schneeberg, P.E.
Gonzalez & Schneeberg
6500 Greenville Avenue, Suite 685
Dallas, TX 75206
RE: Champions School of Real Estate
Fee Assessment Letter -REVISED
Dear Mr. Schneeberg:
Enclosed is a copy of the revised City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
I failed to include the fees associated with the 6" double detector check and vault in the original
assessment. The additional fees for water and sewer taps, water meters, and utility inspection fees need to
be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be
ordered when those fees are paid.
I apologize for any confusion this may have caused. If you have any questions, please contact me.
Sincerely,
~~
~tu'ttin,l~
Teresa M. Turner, E.I.T.
Graduate Engineer
Office (972) 304-3681
Fax (972) 304-3570
cc: Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * P.O.BO% 9478 * COP PELL TX 75019 * TEL 972/462 0022 * FA% 972/304 3673
DEVELOPMENT FEE TABLE
Project: Champions School of Real Estate -REVISED
Date: 8/8/03
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $3,500.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $142.10
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,335.83
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $7,532.72 $7,532.72
'(100% due prior to Council Approval)
Street Light Fee Information not Availa ble
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Availa ble
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $14,250.65
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,532.72
DEVELOPMENT FEE WORKSHEET
PROJECT: Champions School oJReal Estate -REVISED
DATE: 8/8/03
Water Impact Fee:
Domestic Meter(s): 1 ~ 1 1/2 inch = 5 ESU's
Irrigation Meter(s): 1 ~ 1 1/2 inch = 5 ESU's
0 = 0 ESU's
Fireline Meter(s): 1 ~ 6 inch = 2.5 ESU's
Total #: 12.5 ESU's @ $280.00 ea. $3,500.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea. $150.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $142.10 $142.10
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $142.10 $142.10
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 1 Fireline Meter(s) @ $1,193.73 $1,193.73
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5 @ $280.00 ea. $1,400.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0 Single family @ $0.00 per lot $0.00
0 Multi-family @ $0.00 per unit $0.00
(50% paid prior to Council approval of final plat)
Page 1
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of~way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4°Jo of development cost required for public improvements)
$7,532.72
Information not Available
Information not Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Champions School of Real Estate -REVISED
DATE: 8/8/03
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Office
Land Use ** General Office Bldg.
Building Area (sf) 6,293
Development Units ** 6.29
Vehicle Miles per Development Unit ** 3.99
Fee er Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $7,532.72
* (Figure 2 -Roadway Impact Fee Study)
** (Table 3 -Roadway [mpact Fee Study)
*** (Schedule 2, Page 3 -Roadway Impact Fee Study)