Loading...
Champions-CS030808T H E C I T Y O F COPPELL ~~ o ~` e x A s ,$ a August 8, 2003 Robert W. Schneeberg, P.E. Gonzalez & Schneeberg 6500 Greenville Avenue, Suite 685 Dallas, TX 75206 RE: Champions School of Real Estate Fee Assessment Letter -REVISED Dear Mr. Schneeberg: Enclosed is a copy of the revised City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. I failed to include the fees associated with the 6" double detector check and vault in the original assessment. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. I apologize for any confusion this may have caused. If you have any questions, please contact me. Sincerely, ~~ ~tu'ttin,l~ Teresa M. Turner, E.I.T. Graduate Engineer Office (972) 304-3681 Fax (972) 304-3570 cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation 255 PARKWAY * P.O.BO% 9478 * COP PELL TX 75019 * TEL 972/462 0022 * FA% 972/304 3673 DEVELOPMENT FEE TABLE Project: Champions School of Real Estate -REVISED Date: 8/8/03 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,500.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142.10 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,335.83 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,400.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $7,532.72 $7,532.72 '(100% due prior to Council Approval) Street Light Fee Information not Availa ble (100% due prior to Acceptance of Project) Street Sign Fee Information not Availa ble (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $14,250.65 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,532.72 DEVELOPMENT FEE WORKSHEET PROJECT: Champions School oJReal Estate -REVISED DATE: 8/8/03 Water Impact Fee: Domestic Meter(s): 1 ~ 1 1/2 inch = 5 ESU's Irrigation Meter(s): 1 ~ 1 1/2 inch = 5 ESU's 0 = 0 ESU's Fireline Meter(s): 1 ~ 6 inch = 2.5 ESU's Total #: 12.5 ESU's @ $280.00 ea. $3,500.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $142.10 $142.10 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $142.10 $142.10 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 1 Fireline Meter(s) @ $1,193.73 $1,193.73 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 @ $280.00 ea. $1,400.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 Single family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) Page 1 DEVELOPMENT FEE WORKSHEET (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of~way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4°Jo of development cost required for public improvements) $7,532.72 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Champions School of Real Estate -REVISED DATE: 8/8/03 ROADWAY IMPACT FEE: Service Area * 2 Category ** Office Land Use ** General Office Bldg. Building Area (sf) 6,293 Development Units ** 6.29 Vehicle Miles per Development Unit ** 3.99 Fee er Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $7,532.72 * (Figure 2 -Roadway Impact Fee Study) ** (Table 3 -Roadway [mpact Fee Study) *** (Schedule 2, Page 3 -Roadway Impact Fee Study)