Loading...
Northpoint Dr-CS030812T H E C I T Y O F COPPELL ~ @ ~- v'Y' ~ ~ ~ 9 ~ X A s t 8 August 12, 2003 Frank Killingsworth Moss Construction Co., Inc. 3455 FM 544 Wylie, TX 75098 RE: Notification of Repairs /Maintenance Bond Northpoint Drive Extension Dear Mr. Killingsworth: An inspection of the referenced project was conducted recently by representatives of the City of Coppell. The following items need to be repaired immediately: 1. Settling of inlets 2. Damage to inlet throats According to the maintenance bond covering this work, the deficiencies must be corrected in a timely manner and in accordance with City of Coppell inspection standards. Please contact me at 972-304- 3684 to let me know when the deficiencies will be corrected. Since , G~-~J L Davis Construction Inspector cc: Ken Grin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal 255 PARKWAY * P.O.BOX 47B * COPPELL T% 76D19 * TEL 972/462 0022 * FAX 972/304 3673