Loading...
Securelock-CS030808eresa Turner - Re sign Ques Pa g e 1 From: Teresa Turner To: Tim Porter Date: 8/8103 2:38:30 PM Subject: Re: Securlock Design Question Tim: From your discussions with TOOT regarding the drive approaches, do you think they would allow this ?? Teresa >>> "Tim Porter" <tporter @daa- civil.com> 8/8/03 2:15:56 PM >>> Teresa, I'm sorry to bother you so late in the day but, since you're looking at the project right now, I thought I would run this by you... A new factor has come up in the design of the Securlock site. The site cannot have a steep slope at the entrance drive from the 121 access road where the main entrance is located (the south -most drive / closest to Northpoint Drive). The traffic in this area will consist of the occasional large truck with a low -lying trailer. The way the entrance is graded to go up and over the storm sewer would not allow this type of traffic. Would it be possible to direct the runoff from the future development site to the south over the entrance drive at this point? I just don't see any other way of conveying the water subsurface in this area. If you have any ideas, let me know. Thanks, Timothy J. Porter, P.E. Dowdey, Anderson, and Associates, Inc. 972.931.0694