Loading...
Sandy Lk Addn 1B-CS 920813��10 P.O. Box 478 Coppell, Texas 75019 214 - 462 -0022 August 13, 1992 Mr. Leo Wehkamp, President Tri Star Construction Company 535 West Purnell, Suite 110 Lewisville, TX 75057 Dear Mr. Wehkamp: On August 3, 1992 you requested a variance to the Subdivision Ordinance to change the thickness on the concrete parking lot at the 6" to 5 ". You also requested the lime stabilization requirement be waived. On August 11, 1992, I submitted a request to the City Council for a variance to the thickness of the concrete. The Council did vary the thickness requirements from 6" to 5 ". Also, our Subdivision Ordinance allowed the Engineering Department to waive the lime stabilization if the PI was between 6 and 12. The soil report you submitted showed that the PI for this property was between 9 and 10. Therefore, the requirement for the lime stabilization has also been waived. If you should have any questions concerning this, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer KMG/bd cc: Larry Davis, Construction Inspector STARLTR