Loading...
Sandy L Add L2BA-CS 960606DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Sandy Labe Addition Lot 2 Bloch A. ftininarr Pld to allow the operation of a day care center on 1.937 acres of property, located at west side of Samuel Blvd, approximately 184.93 fed north of Sandy Lake Road, at the request of Dowdey, Anderson & Associates, Inc. DRC DATE May 30, 1996 and June 6, 1996 CONTACT: Mike Marlin, E.I.T., Assistant City Engineer (303679) COMMENT STATUS: ✓FINAL �B AFTER P&3 Preliminary Plat comments: i1. Show the existing right -of -way dimension of Samuel Blvd. 2. Indicate location of fire lane. 3. Show visibility triangles at all ingress /egress. - Signature block for Floodplain Administrator needs to be put on the plat. 5. Provide utility easement for proposed water vault. 6. Also, provide an easement for existing storm system at southeast corner of property. 7. The connection to the existing private 8" water line located at the southeast corner of the property will not be allowed unless a signed agreement is acquired from the owner of the private water line. Preliminary water, sanitary sewer and storm sewer plan comments: 8. The proposed meters located along Samuel Blvd. need to be located in a utility easement so they do not conflict with the proposed sidewalk which will be located in the right -of -way. This is an informational comment only. 9. Impact fees required.