Sandy L Add L2BA-CS 960801DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: &1& Lake Addition (Children's Fbst Academy) Lot 2 Block A.
Hnal PIQt, to allow the operation of a day cart center on 1.937
acres of property, located on the west side of Samuel Boulevand,
approximately 184.93 fed north of Sandy Lake Road, at the request
of Dowdey, Anderson and Associates, Inc.
DRC DATE. July 25, 1996 and August 1, 1996
k C O NTACT. • Mike Martin, E.I.T., Assidant (Sty Engineer (304 -3679)
MMENT STATUS: ✓FINAL RB
1) Indicate location of fire lane.
2) The connection to the existing private 8" water line located at the southeast comer of the
property will not be allowed unless a signed agreement is acquired from the owner of the
private water line.
3) Show visibility sight triangles at all ingress /egress points.
4) Show turning radius of firelane.
5) Site plan shows a 20' access easement. Which one is correct?
6) Label access easement as a fire lane.
Site Plan
1) Provide utility plans and drainage plans.
2) The proposed meters located along Samuel Blvd. need to be located in a utility easement so
they do not conflict with the proposed sidewalk which will be located in the right -of -way.
This is an informational comment and should have no bearing on the approval of the plat:
1) Impact fees will be required.