Loading...
Freeport NIP(7.0)-LR030805 (2)RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: Test Methods: M/D No. 1 TEST NO Freeport 10 500 Freeport Parkway Coppell, TX Perform In -Place Density Test in accordance with ASTM Standards. CONTRACTOR: Duke Realty Services, LP ASTM D -2922 ASTM D -3017 Dark Brown Clay Backfill 1 Inside building leave Line F -15, 1st lift Backfill 2 Inside building leave Line G -15, 1st lift Backfill 3 Inside building leave Line H -15, 1st lift Backfill 4 Inside building leave Line A -6, 1st lift Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers Description TEST LOCATION PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 31705 Test Mode: DT MOISTURE DENSITY RELATIONS Maximum Moisture Density pcf out, Building Column, out, Building Column, out, Building Column, out, Building Column, Test results on this FIELD DENSITY TESTS PROBE DEPTH 6" 1 6" 1 6" 1 6" 1 Previous: 698 22.8 120.5 23.3 122.8 23.0 123.4 23.9 120.7 report meet project specification. Started: 7:OOam Finished: 12:OOp 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Report No.: Project No.: Date of Service: Report Date: 192094 037333 08/04/2003 08/05/2003 Standard Counts Moisture Density Current: 711 Current: 2733 Previous: 2723 Project Requirements Moisture Density 19.5 104.5 +3 and above 92 -96 M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (pct) (pct) max) 98.1 99.6 100.3 97.4 (1) Engineering Analyst (1) City of Coupe]] Bldg. Inspections Scott Watson, AET CMT Operations Manager 94 95 96 93 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 1 Items Inspected: Conforming Non Conforming Items Inspected: Conforming Non Conforming Items Inspected: Conforming Non Conforming Placing Drawings Approved L- Bar Length and Shape Column Ties Properly Tied and Spaced Bar Size (.r'^ Proper Bar Placement I---.. Stirrup Spacing and Type Bar Grade Properly Tied Lapped Splices 4----- Bars Clean Dowel Bars in Place Welded Splices Form Clean C Proper Bar Supports e.-- Mechanical Splices Number Bars Proper Cover I-- Rone Engineers 6300 Rothway, Suite 150 Houston, Texas 77040 (713) 996 -9979 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 Report of Reinforcing Steel Inspection Client: Iivkeo Report No.: Project No.: 03 7 3 33 Project: Fregv v /0 Date of Service: Y Page of Locations and Items Inspected: /Y., nAk 1/9/' 4/r, p «k; lof Sidi L ;,tr it Z 2696 Gravel Drive Fort Worth, Texas 76118 (817) 284-1318 Discrepancies Comments: 5c, nr/`e beef Inspector's Signature: -6,'st 2014 (7/03) Time: /2 cePrr to /2 3o p, Client/Contractor Signature: Client/Contractor Copied with Results: Yes No LIMRATIONS'. The mat results presented herein here p "Nn"1 bawd upon the aped simples provided for testing. We auuom nn responsibility for variation in quality (composition appearance. perfommnce, etc.) or any other feature of similar abject mans provided by persons or conditions over which we hove no control. Our letters and mporte are for to exclusive use of Oe clients to whom they are addressed and shall not be reproduced except in NH without M wrinen approval of gone Engineers. Ltd.