Loading...
DR0001-CS030819T H E C I T Y O F F ' �W X A 5 a August 19, 2003 Carl Coble Site Concrete, Inc. PO Box 154489 Irving, TX 75015 -4489 RE: MacArthur /Samuel Drainage Project DR 00 -01 Final Walk -thru Dear Carl: Please be advised that a walk - through has been scheduled for Thursday, August 21, 2003 at 9:00 a.m. for the paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972- 304 -7090 at your earliest convenience. Sincer /? Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Suzan Taylor, CIP Coordinator Per Birdsall, Streets Operations Mgr. Larry Rivera, Parks Crew Leader