ST9502-CS 960327COPPELL ENGINEERING
UTILITIES DIVISION
MEMORANDUM
DATE:
TO:
FROM:
RE:
March 27, 1996
Larry Davis, Construction Inspector
Ted Dutt, Interim Utilities Superintendent~A)-
Walk thru for Spine Road and East/West Blvd.
A walk-thin on the above referenced project was conducted on 3/26/96 and all items have
been taken care of at this time.
If you have any questions, please give me a call.
TD/dg