Loading...
ST9905-CS030811 THE.CITY.OF corrELL "i-~~;~~'~ * ~.'~. '\"'~' "f. ;- ~"., ,'r~~ a t ,:.u- ""',,-~ q .t Ii [j \ ~ August 11, 2003 JMC Restaurant Distribution, Inc. Mr. Robert Kulick 1080 W. Bethel Road Coppell, Texas 75019-4427 RE: Bethel Road I / ST 99-05 Parcel 12 - Temporary Construction Easement Dear Mr. Kulick: The City of Coppell is currently working with the engineering firm of TranSystems Corporation to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. The project is in the final deSign phase and the City is in the process of acqUiring the right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired within the project limits. It will be necessary to acqUire a 20- to 30-foot temporary construction easement on property that is owned by JMC Restaurant Distribution, Inc. The temporary construction easement will provide the contractor with sufficient work area to construct the roadway. The temporary construction easement is not filed with Dallas County, so there will not be a permanent encumbrance on your property associated with this easement. With this letter I am providing a copy of the temporary construction easement documents necessary for the construction of Bethel Road I. Please review the enclosed documents and let me know if you have any questions or if you wish to vIew the construction plans. Franchise utility relocations have started and more will begin once all of the right-of-way is acquired. It is anticipated that construction will begin in April 2004. Your consideration of this matter is appreciated. Sincerely, \~. .... . , VI T~ Lev Suza ylor CIP C inatar 972-304-7019 Enclosures 255 PARKWAY * PO E:lOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 THE CITY.OF corrELL "i-"~~\~'~ * 1~:M~~~"f. F ~'\~ a r~~~~~ Q .t A S \ ~ August 11, 2003 Texas Dugan Limited Partnership Ms. jeanne Coyle 5495 Belt Lme Road SUIte 360 Dallas, Texas 75254-7644 RE: Bethel Road I / ST 99-05 Parcel 9 - RIght-of-Way / Parcel 9E -Temporary Construction Easement Parcel 11 - Right-of- Way / Parcel 11 E - Temporary Construction Easement Dear Ms. Coyle: The City of Coppell is cun'ently working with the engmeermg firm of TranSystems Corporation to deSign Bethel Road I, hom the west City limits to Freeport Parkway. The project consists of the widemng of the eXlstmg two-lane asphalt roadway to a four-lane diVided roadway with nnproved dramage. The project is m the fmal deSign phase and the City is in the process of acqUiring the right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acqUired within the project limits. It will be necessary to acquire nglit-of-way and a IS-foot temporary constructiOn easement on Parcel 9, and right-of-way and a lO-foot temporary construction easement on Parcel 11. The reqUIred nglit-of-way on Parcel 9 is a comer chp at the mtersectlon of Freeport Parkway and Bethel Road. On Parcel II, addItiOnal right-of-way will be required at the 1l1tersectlOn of Freeport Parkway and Bethel Road in order to accommodate a proposed nght-liand tum lane. The temporary construction easements will proVide the contractor With suffiCient work area to construct the roadway. The temporary constructIon easements are not filed With Dallas County, so there WIll not be a permanent encumbrance on your property associated with these easements With this letter I am provldmg a copy of the riglit-of-way and temporary construction easement documents nccessary for the constructIOn of Bethel Road I. Please review the enclosed documents and let me know If you liave any questions or If you wish to view the constructIon plans. Franchise utility relocations have started and morc v/111 begin once all of the right-of-way IS acquired. It IS anticipated that constructIOn will begm 111 April 2004 Your consIderation of this matter IS appreCiated. Sincerely, \c::", leV. Iv '-)'c~..... V) \ UJ Suza /. ylor CIP C dinator 972-304-7019 Enclosures 255 PARKWAY * r' () oox 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/3G4 3673 THE.CITY.OF corrELL "i-'~~~l * J!J.l#t#!:?"f. ~ I:~~~~ C) .t AS" \ ~ August II, 2003 Emerson Properties 10005 Technology Boulevard W. Suite 151 Dallas, Texas 75220-4338 RE: Bethel Road I / ST 99-05 TE Freeport North Land II, LTD. Parcel 6 - Right-of-Way Parcel 6E - Temporary Construction Easement Dear Sir: The City of Coppell is cun'enOy working with the engineering firm of TranSystems Corporation to design Bethel Road I, from the west City limits to Freeport Parkway. Tlie project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. The project is in tlie final deSign phase and the City is in the process of acquiring the right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired within the project limits. It will be necessary to acquire right-of-way, and a lO-foot temporary construction easement on property that is owned by Emerson Properties. The required right-of-way is a comer clip at the intersection of Royal Lane and Bethel Road. The temporary construction easement will provide tlie contractor With sufficient work area to construct the roadway. Tlie temporary construction casement IS not filed with Dallas County, so there will not be a penn anent encumbrance on your property associated With this easement. Witli this letter I am providing a copy of the right-of-way and temporary construction easement documents necessary for the construction of Bethel Road I. Please review the enclosed documents and let me know If you have any questions or If you wish to view the construction plans. Franchise utility relocations have started and more will begin once all of tlie right-of-way is acquired. It is anticipated that construction will begin in April 2004. Your consideration of this matter is appreciated. Sincerely, G4.XCLY) T ~Wl/ SuzaJ \aylor CIP C-ourdinator 972-304- 7019 Enclosures 255 PARKWAY * PO BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * F"AX 972/304 3673 THE.CITY.OF August 11, 2003 Gulf Bearing Mr. Ross Ramsey 675 S. Royal Lane, Suite B Coppell, Texas 75019-3805 RE: Bethel Road 1 / ST 99-05 Parcel 5 - Right-of-Way Parcel 5E - Part I, Part 2 - Temporary ConstructiOn Easement Dear Mr. Ramsey: The City of Coppell is currently working with the engmeerIng firm of TranSystems Corporation to design Betliel Road I, from the west City limits to Freeport Parkway. The project consists of the widening of tlie existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. The project is in the final deSign phase and the City is in the process of acquiring tlie right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three pennanent slope easements, and flftecn temporary construction easements to be acquired within tlie project limits. It will be necessary to acquire right-of-way and two 15- foot temporary construcl1on easements on property that is owned by Gulf Bearing, Inc. The required right-of-way is a comer clip at tlie intersection of Royal Lane and Bethel Road. The temporary construction easements are along the south and east property lines. These two easements will provide the contractor with sufficient work area to construct the roadway. The temporary construction easements are not filed with Dallas County, so there will not be a permanent encumbrance on your property associated with these easements. With this letter 1 am providing a copy of tlie right-of-way and temporary construction easement documents necessary for the construction of Betliel Road 1. Please review the enclosed documents and let me know If you have any questions or If you wish to view the construction plans. Francliise utility relocations have started and more will begin once all of the right-of-way is acqUIred. It is antiCIpated that construction WIll beglll III April 2004. Your consideration of this matter is appreciated. Sincerely, '~., T;:'cu' cd ",,- ' .-ti..:v\ \ ll~\ \.A,.'v Suza!, ylor CIP &0 dinator 972-304-7019 Enclosures 255 PARKWAY * P,O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 THE-CITY.OF August 11, 2003 corrELL "i-"~~'~"~.'~I * tJj.~4>.J"""f. .~~" " c.~~ , , .~~-a I: ,"'.......... Q A' Ii S . \ ~ Dallas/Fort Worth IntematJonal Airport Mr. Michael E. Pyles P.O. Box 619428 DFW Airport, Texas 75261-9428 RE: Bethel Road I / ST 99-05 Parcel 4 - Right-of-Way / Parcel4EI - Slope Easement Parcel 4E - Part I, Part 2, Part 3 - Temporary Construction Easement Dear Mr. Pyles: The City of Coppell is currently working with tlie engineenng firm of TranSystems Corporation to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway witli improved drainage. The project is in the final desi!,'11 phase and the City is in the process of acquiring the right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired witliin the project limits. It will be necessary to acquire right-of-way, a 10-foot slope easement, and three 10- to 20- foot temporary constructIOn easements on property owned by the DFW AU']Jort. A mimmum nght-of-way widtli of 90 feet IS reqUIred for a four-lane divided roadway. The existing nght-of~way in the vicinity of your property is t.75 feet. Additional right- of-way will also be required at the intersection of Royal Lane and Bethel Road in order to accommodate a nght-hand tum lane. It will not be pOSSible to tie the proposed roadway elevatiOns into the existing ground elevations within the limits of tlie proposed right-of-way on a portion of your property. A slope easement will be required in tliis area. The temporary construction easements will provide the contractor with sufficient work area to construct the roadway. The slope easement and temporary construction easements are not filed with Dallas County, so tliere will not be a pemlanent encumbrance on your property associated with these easements With this letter I am providing a copy of tlie right-of-way, slope easement, and temporary construction easement documents necessary for the construction of Bethel Road 1. Please review the enclosed documcnts and let me know if you have any questions or if you wish to view the construction plans. Franchise utility relocations have started and more will begin once all of the right-of-way is acquired. It IS anticipated that construction will begin in April 2004 Your consideration ofthis matter is appreciated. Sincerely, (~,.. Y) TCut lev- Suzah aylor CIP oordinator / 972-304-7019 Enclosures 255 PARKWAY * PO BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 THE.CITY.OF corrELL ~\tii,~ ~~... (iiJ.'.' (i.' CY C "i- ,,-~q-q.,~, * ~ )' ,,~.-"- .../}~~ {' ~ ,-,,'~ Q -t Ii ,<; \ \) August 11, 2003 Walter Hogg, PS 3136 Routh Street, Suite 203 Dallas, Texas 75201-1335 RE: Bethel Road I / ST 99-05 Parcel 3 - Right-of-Way Parcel 3E - Slope Easement Parcel 3El - Temporary Construction Easement Dear Sir: The City of Coppell is currently working with the engineering firm of TranSystems Corporation to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. Tlie project is in the final deSign phase and the City is m tlie process of acquiring the right-of-way and easements necessary to construct tlie project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired witliin the project limits. It will be necessary to acquire nght-of-way, a 5-foot slope easement, and a 10- to IS-foot temporary construction easement on property that is owned by tlie WaIter Hogg Partnersliip. A minimum nght-of-way width of 90 feet is required for a four-lane divided roadway. The existing nght-of-way in the vlcmlty of your property is 45 to 50 feet. It will not be possible to lie the proposed roadway elevatIOns mto the existmg ground elevations within tlic limits of the proposed right-of-way along the westem side of the property. A slope easement will be required m thIS area. The temporary construction easement will provide the contractor with sufficient work area to construct the roadway. The slope easement and the temporary construction easement are not filed wltli Dallas County, so there will not be a permanent encumbrance on your property associated with these easements. With this letter I am providing a copy of tlie right-of~way, slope easement, and temporary construction easement documents necessary for the construction of Bethel Road I. Please review the enclosed documents and let me know if you have any questions or if you wish to view the construction plans. Franchise utility relocations have started and more will begin once all of the right-of-way IS acquired. It IS anticipated that constructIOn will begin in April 2004. Your consideratIOn of this matter is appreciated. Sincerely, ,5....~..v\ \C'"-1l.cv- Suza6 aylor CIP . rdinator 972-304-7019 Enclosures 255 PARKWAY * PO BOX 9476 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 THE.CITY.OF corrELL "i-~~~~~~'~ *.,1Jj~"f. l' -,-,,~~ a (' - """~ q -t Ii,~ . \ ~ August 11, 2003 Fellowslilp of Las Co' s 350 I N. Mac r Boulevard Suite 50 Irvi ,Texas 75062-3636 rf::LLCl wS1-l1f' cH \,l ~cl-\ :2460 <;H \'2..1 S GRA~I/'NE 1'i< 7hO!;/ RE: Bethel Road I / ST 99-05 Parcell - Right-of-Way Parcell E - Tcmporary Construction Easement Dear Sir: The City of Coppell is currently working with the engmeenng firm of TranSystems Corporation to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. The project is in the final design pliase and the City is in the process of acquiring the riglit-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired witliin the project limits. It will be necessary to acquire right-of-way and a 10- to 15- foot temporary construction easement on property that IS owned by tlie Fellowship of Las Colinas. A minimum right-of-way widtli of 90 feet IS reqUired for a four-lane divided roadway. The existing right-of-way in the vicinity of your property is 45 to 50 feet. The temporary construction easement will provide the contractor willi sufficient work area to construct the roadway. The temporary construction easement is not filed with Dallas County, so there will not be a permanent encumbrance on your property associated With this easement. With this letter I am providing a copy of tlie right-of:way and temporary construction easement documents necessary for the construction of Bethel Road I. Please review the enclosed documents and let me know if you have any questions or if you wish to view the construction plans. Franchise utility relocations have started and more will begin once all of the riglit-of-way is acquired. It is anticipated that constructIOn will begin in April 2004. Your consideration of this matter is appreciated. Sincerely, ~. .' ~ ",) TC4.\ 6,- Suz aylor CIP ordinator 972-304-7019 Enclosures 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 ()022 * FAX 972/304 3G73 THE.CITY.OF corrELL ,{L~~~~\~.~ *..~ e~'r. "f. t ~":-~\ ~~-_ Cl t "'ir.,~ q -t Ii <') \ '6 August 12, 2003 Texas Dugan Limited Partncrship Ms. Jeanne Coyle 5495 Belt Line Road Suite 360 Dallas, Texas 75254-7644 RE: Bethel Road I / ST 99-05 TE Freeport North Land II, LTD. Parcel 6 - Right-of-Way Parcel 6E - Temporary Construction Easement Dear Ms. Coyle: Enclosed please find right-of-way and temporary construction easement documents for Parcel 6. Tliese documents are in additIOn to the Parcel 9 and Parcel II easement documents sent to you on August 11, 2003. The documents were origmally sent to Emerson Properties who informed me that Texas Dugan Limited Partnership now owned the property. The required right-of-way is a comer clip at the intersection of Royal Lane and Bethel Road. Your consideration of tliis matter is appreciated. Sincerely, ~\ IC4{\..oV- Suz aylor CIP , rdinator 972-304-7019 Enclosures 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673