Loading...
First Baptist-CS030825To: l j 1! 040.-En 1 Phone: Re: T H E C I T Y O F COPPELL ENGINEERING DEPARTMENT FAX COVER SHEET Fax: 91 D, F1 From: Teresa Turner Date: 8 Pages: —7 (including cover sheet) CC: Urgent ❑For Review Please Comment Please Reply FeA, Ass s t t p I, 2 i e Pro ceSS MESSAGE CONF I RMAT I ON P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304 -3681 Fax: (972)304 -3570 X As Requested 08/25/2003 11:21 ID =CITY OF COPPELL ENGR. DEPT. DATE TIME 8.P -TIME DISTANT STATION ID MODE PAGES RESULT 08/25 11:18 01'52" 9724628431 CALLING 04 OK 0000 After Site Plan and Final Plat approval by Planning and Zoning Commission Engineering Department will consider approval of early grading. 1. Submit grading plans for review including: cover sheet, plat, grading plan, and erosion control sheets. 2. If approved, pay grading inspection fees (provide copy of contract to Engineering Dept); grading inspection fees will be calculated as 2% of grading contract cost. 3. Complete early grading permit at Engineering Dept. and provide copy of N 0.1 TPDES General Permit (if required). 4. Developer /owner holds City harmless for any adjustments in grading identified during plan review /Council action if commencing early grading. 5. Grading preconstruction conference required prior to commencing dirt work. alt After Site Plan and Final Plat approval by City Council Submit civil plans for review (see Subdivision Ordinance for required elements of civil plans). Review will not begin until final plat approval by City Council. However, minor revisions may be necessitated by engineering review, therefore, the plat should not be prepared for filing with the County (i. e. obtaining franchise utility BRIAN) signatures) until after the first engineering review. Allow 2 -3 weeks for each plan review and expect 2+ iterations. Schedule meeting with Engineering staff to resolve major issues. Impact fees are assessed by the Engineering staJfand submitted in writing to Project Engineer. 1. Plat will not be processed for signatures before roadway park impact fees (if applicable) are paid. Please note that under Senate Bill 243, the Texas Legislature delayed the collection of Water and Sewer Impact fees until the issuance of a Building Permit. Water and Sewer impact fees are to be paid to the Building Inspections Department, 500 Southwestern Blvd. 2. Plans will not be approved before payment of roadway park impact fees (if applicable) and inspection fees (provide copy of contract to Engineering Dept.); inspection fees will be calculated at 2% of contract cost for private work and 4% for work in the public right -of -way or easements. T H E C I T V O F COPPELL GENERAL ENGINEERING PLAN REVIEW PROCESS DRC Review Engineering will review development plans for major issues concerning right -of -way, easements, traffic, utilities, floodplains and other project specific engineering issues. The DRC Review is not a full engineering review. After approval of Engineering Plans Plans will be signed and stamped by Engineering staff Preconstruction conference required prior to beginning construction. Possible delays in the Plan approval process Floodplains: Development must comply with the City of Coppell Floodplain Management Ordinance. 1. Will a LOMR be required? If so, allow time for the review of these studies by the City and FEMA. Development may commence upon receipt ofCLOMR from FEMA. 2. Will a LOMA be needed? If so, work directly with FEMA. Work may commence upon receipt of LOMA from FEMA. Corps of Engineers, CDC and EPA permitting allow time for the permitting process; provide copy of NOI to City prior to commencing work. Right -of -way use agreements, ofJ=site easements, public improvement districts and other property agreements allow time for these processes. *NOTE: This checklist is general in nature and for informational purposes only. For specific engineering requirements, see the City of Coppell Subdivision Ordinance, Floodplain Management Ordinance and Standard Construction Details. Foams /planreview Revised 5/03