Loading...
WA9701-CS030822vM 91 -01 BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenvll le Ave., #220 JOAN W_ BIRKHOFF, P.E. RONALD V. CONWAY, P GARY C. IIENDRICKS, P.E. JOE R. CARTER, P.E. PAULA CARLINE, P.E. MATT HICKEY. P.E. DOUGLAS K- SHOW ERS, P.E. ROSS L. JACOBS, P.F.. Mr. Kenneth Griffin, P.E. City Engineer / Director of Public Works City of Coppell Post Office Box 478 Coppell, Texas 75019 August 22, 2003 Re: Denton Tap Road 16 -inch Water Line (Airline Drive to Bethel Road) Preliminary Plans Dear Mr. Griffin: Phone(214)361 -7900 We are enclosing two sets each of full size and half size preliminary construction plans for the Denton Tap Road 16 -inch Water Line (Airline Drive to Bethel Road). This set represents a 90% complete submittal and is for your review and comment. In addition, a copy of the preliminary specifications and quantities has been included for your review and comment. Based on this preliminary submittal, our opinion of probable construction cost for this project is in the range of $430,000. Please notify us of your review comments at your earliest convenience. Enclosures cc: Ms. Suzan C. Taylor, C.I.P. Coordinator , Ac I,, c.1 rappel12002 -124 demm� 1, rd wlllen<rslcone, k190 %, -b —,1.1 doc Dallas, Texas 75231 Fax (214) 361 -0204