Loading...
Champions-CS030826Suzan' Taylor - RE: 30 "Water Line to Flower Mound Page 1 C I~ A-n ~ toy..[ ; C F4o~ ~ c~F From: "Hamid Baha" <hbaha@dwu.ci.dallas.tx.us> To: "Erick Steitle" <esteitl@dwu.ci.dallas.tx.us>, "Michael Fay" <mfay@dwu.ci.dallas.tx.us>, "Taylor Suzan" <staylor@ci.coppell.tx.us> Date: 8/26/03 8:42AM Subject: RE: 30 "Water Line to Flower Mound Erick, If this is a private development it is outside of City Of Dallas and it is not governed by Dallas "Development Services". City of Coppell, and the contractor are obligated to call inform DWU which it appears they did thru you, they probably should have provided you with a set of drawings. Either you or Inspection sections need to coordinate this work with contractor, probably valve crew need to be notified. Suzan, Thanks for letting us know of the activities around this transmission line. Contractor need to exercise extreme care working in the proximity of this line, it does not take much to breach the integrity of a 30-inch water line under pressure. Hamid Baha -----Original Message----- From: Erick Steitle [mailto:esteitl@dwu.ci.dallas.tx.us] Sent: Monday, August 25, 2003 1:34 PM To: Hamid Baha; Michael Fay Cc: Marco Ramirez; Erling Holey Subject: FW: 30 "Water Line to Flower Mound I think this was meant for your shop. Erick Steitle DWU Relocation Project Engineer ph# 214-671-9527 fax# 214-243-1110 -----Original Message----- From: Suzan Taylor [mailto:STAYLOR@ci.coppell.tx.us] Sent: Monday, August 25, 2003 10:59 AM To: esteitl@dwu.ci.dallas.tx.us Subject: 30 "Water line to Flower Mound Erick: The Champion School of Real Estate is currently under construction at the intersection of Natches Trace and Denton Tap in Coppell. The contractor for the job will be excavating over your 30" water line to Flower Mound to install a storm drain. The City Inspector for the project wanted to let you know. Suzan`Taylor - RE: 30 "Water Line to Flower Mound Page 2 CC: "Marco Ramirez" <maramir@dwu.ci.dallas.tx.us>, "Erling Holey" <eholey@dwu.ci.dallas.tx. us>