Champions-LR030805REEa Er1Gl1--IEER11""IG
GEOTECHNICAL AND G R O LJ P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Champion School of Real Estate
Denton Tap Road and Natches Trace Drive
Coppell, Texas
REPORTED TO: Smith Commercial Contracting
14350 West Sylvanfield
Houston, Texas 77014
ATTN: Mr. Patrick Popowitz
REPORT NO. 4
REG PROJECT NO. 10314
SAMPLE DATE: 08-05-03
TECHNICIAN: W. Eberhardt
CONTRACTOR: Smith Commercial Contracting
.ocation of Sam le
Set Number Location _ Quantity Represented
1 Piers: M-2, M-1, H-1, E-1, A-1, H-2, L-3, M-3 and 10/16
G-3
rater Ixa~Lar~
Set Cylinder Age Total Load Co Average
No. ID Date Tested lbs. .s." Stren th .s.i,
1 1210 08-12-03 7 106740 378
1210 09-02-03 8
1210 09-02-03 28
1210 Hold H
r..l:.,ae, n~t~
Set
No. Cylinder
ID
Slum Time of
Sam le
Air Tem Concrete
Tem Air
Entrainment Ticket
Number
1 1210 5.75 2:OOPM 100 96 N/A 113819
Mail
Distribution: (1) Smith Commercial Contracting/
Mr. Patrick Popowitz
(1) Jacobs & Associates/
Mr. David Koslan
(1) City of Coppell/Mr. Larry Davis
~~
~~~ ~•~ D~
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. SUITE 400 DALLAS, T% 75235 rei [214] 350 5600 rqx [214] 350 0019