Loading...
Champions-LR030805REEa Er1Gl1--IEER11""IG GEOTECHNICAL AND G R O LJ P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Champion School of Real Estate Denton Tap Road and Natches Trace Drive Coppell, Texas REPORTED TO: Smith Commercial Contracting 14350 West Sylvanfield Houston, Texas 77014 ATTN: Mr. Patrick Popowitz REPORT NO. 4 REG PROJECT NO. 10314 SAMPLE DATE: 08-05-03 TECHNICIAN: W. Eberhardt CONTRACTOR: Smith Commercial Contracting .ocation of Sam le Set Number Location _ Quantity Represented 1 Piers: M-2, M-1, H-1, E-1, A-1, H-2, L-3, M-3 and 10/16 G-3 rater Ixa~Lar~ Set Cylinder Age Total Load Co Average No. ID Date Tested lbs. .s." Stren th .s.i, 1 1210 08-12-03 7 106740 378 1210 09-02-03 8 1210 09-02-03 28 1210 Hold H r..l:.,ae, n~t~ Set No. Cylinder ID Slum Time of Sam le Air Tem Concrete Tem Air Entrainment Ticket Number 1 1210 5.75 2:OOPM 100 96 N/A 113819 Mail Distribution: (1) Smith Commercial Contracting/ Mr. Patrick Popowitz (1) Jacobs & Associates/ Mr. David Koslan (1) City of Coppell/Mr. Larry Davis ~~ ~~~ ~•~ D~ Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. SUITE 400 DALLAS, T% 75235 rei [214] 350 5600 rqx [214] 350 0019