MEMO
Re: Securlock Small Business Park Review Comments Addressed
Please see the following documentation addressing the City of Coppell Construction Plan
Review Comments for Securlock Small Business Park, Lot 1, Block A dated August 14, 2003:
GENERAL NOTES:
1.) The work done on the tie-ins to 121 will be on the paved shoulder. Therefore, I have
included a different Traffic Control Plan detail to correspond to a shoulder closing vs. a
lane closing.
2.) Plans were submitted to TxDOT on August 15, 2003.
3.) -
PLAT:
1.) A utility easement has been added for the fire hydrant adjacent to 121.
2.) A utility easement has been added for the vault adjacent to 121.
GRADING PLAN:
1.) Per our discussion. (The drainage area map has been adjusted to show a more detailed
view of the area running towards the adjacent property. Also, the grading plan has been
updated to include a swale in the northern portion of the site.)
DRAINAGE PLAN:
1.) The flumes have been labeled.
2.) The double 18 inch pipes have been replaced with four (4) 12 inch pipes.
STORM SEWER PLAN /PROFILE:
1.) The note has been updated.
2.) The spelling mistake has been corrected.
3.) Cross Sections of these lines have been added to the Storm Sewer Sheet.
X:\Pmie LDDb2331WO Wty mm memo 052503.db
4.) A full profile from "A" to "B" has been added.
UTILITY PLAN:
1.) Notes have been added.
2.) 1 have contacted Travis Crump and have had the fire hydrant and fire department
connections reviewed.
3.) Manhole and cleanout spacings are within the guidelines of the City of Coppell.
4.) The 90 degree bend has been replaced by two (2) 45 degree bends to avoid a conflict
with the paving.
5.) A valve has been added prior to the plug at the north end of the proposed 8" waterline
along 121.
SANITARY SEWER & WATERLINE PLAN /PROFILE:
1.) Profile and plan have been changed to correspond with each other. We will be building
an 8" sanitary sewer line per City requirements.
PAVING PLAN:
1.) All pavement details now correspond with each other.
SWPPP:
1.) A construction site notice has been forwarded to the client to fill out and sign.