Loading...
SC-Cottonwood E9-LR 950719FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620.7328 I FIELD DENSITY REPORT CLIENT: Coppell ISD PROJECT NO.: 0751 -2055 PROJECT: Cottonwood Elementary School, Coppell, Texas REPORT DATE: July 19, 1995 Page I MOISTUREMENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture (Yo) 1 Brownish, red silty clay with gray clayballs 109.2 18.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 145 1 West parking lot, 50 feet west property line, 105.1 19.3 96.2 115 feet south of N inyard Court, 3rd lift 146 1 West parking lot, 90 feet east of west property 107.1 18.1 98.1 line, 125 feet south of Minyard Court, 3rd lift 147 1 West parking lot, 165 feet east of west 107.6 20.0 98.6 property line, 130 feet south of N inyard Court, 3rd lift 148 1 West parking lot, 200 feet east of west 107.2 20.8 98.1 property line, 140 feet south of Minyard Court, 3rd lift 149 1 West parking lot, 60 feet north of gym, 20 106.0 18.9 97.1 feet east of northwest corner, 3rd lift 150 l West parking lot, 50 feet north of gym, 15 104.1 19.8 95.3 feet west of northeast comer, 3 rd lift FUGRO- McCLELLAND (SOUTHWEST), INC. a m 2880 Virgo lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 820.7328 FIELD DENSITY REPORT 151 1 West parking lot, 75 feet north of gym, 30 105.9 18.5 feet west of northeast comer, 3rd lift 152 1 West parking lot, 75 feet north of gym, 50 109.2 19.4 feet west of northwest corner, 3rd lift Remarks: All densities meet project specifications unless otherwise noted. Bob Shea Fugm- McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: �\ f Swso Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock 97.0 100.0 FUGRO- McCLELLAND (SOUTHWEST), INC. a m 2880 Virgo Lane; Dallas. Texas 75229 Ph (214) 4848301; Fax (214) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD PROJECT NO.: 0751 -2055 PROJECT: Cottonwood Elementary School, Coppell, Texas REPORT DATE: July 19, 1995 DATE PERFORMED: Ju y 8,1995 MOISTUREIDENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pc1) Optimum Moisture ( 1 Reddish brown, sandy clay with grey clay balls 122.5 11.1 Remarks: *Does not meet project specifications for percent moisture content. Bob Shea Fugro- McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: 5 � `o ` SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock PERCENT OF MAXIMUM DENSITY 91.2 99.4 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE NO. NO. WEIGHT CONTENT PERCENT 117 1 Sewer line, 40 feet south of N inyard Dr, and 111.7 16.4' Gibson Court, 1st lift 118 1 Sewer line, 35 feet south of Minyard Dr. and 121.7 12.6 Gibson Court, 2nd lift Remarks: *Does not meet project specifications for percent moisture content. Bob Shea Fugro- McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: 5 � `o ` SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock PERCENT OF MAXIMUM DENSITY 91.2 99.4 town FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620.7328 FIELD DENSITY REPORT CLIENT: Coppell ISD PROJECT NO.: 0751 -2055 PROJECT: Cottonwood Elementary School, Coppell, Texas REPORT DATE: July 19, 1995 Page 1 MOISTUREIDENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (per) Optimum Moisture (Y.) 1 Reddish brown, sandy clay with grey clayballs 122.5 11.1 2 Reddish brown, silty clay with grey clayballs 109.2 18.0 3 Brown sandy clay with yellow and red clayballs 113.5 16.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 119 1 Retest #119, 07/08/95 115.1 13.7 94.0 120 1 Sewer line, 60 feet south of Minyard Court 115.8 13.5 94.5 and Gibson Court, 3rd lift 121 1 Sewer line, 70 feet south of Minyard Court 114.5 14.0 93.4 and Gibson Court, 4th lift 122 1 Sewer line, 90 feet south of Minyard Court 115.7 13.3 94.5 and Gibson Court, 5th lift 123 1 Sewer line, 100 feet south of N inyard Court 112.1 14.1 91.8 and Gibson Court, 6th lift 124 2 Sewer line, 20 feet west of northeast comer of 112.1 13.5 91.5 north section of building A, 30 feet north of building, 7th lift 125 2 Sewer line, 40 feet west of northeast comer of 103.8 16.8 95.0 north section of building A. 30 feet north of building, final lift 126 3 Parking area, 375 feet south of Minyard 109.1 16.1 96.1 Court, 20 feet east of west property line, final lift 127 3 Parking area, 385 south of N inyard Court, 40 109.1 18.1 96.1 feet east of west property line, final lift 128 3 Parking area, 210 feet south of M ityard 108.5 17.1 95.6 Court, 30 feet east of west property line, final lift 129 3 Parking area, 180 feet south of Minyard 11.1 16.2 97.9 Court, 50 feet east of west property line, final lift