Loading...
SC-Cottonwood E9-LR 950802FUGRO- McCLELLAND (SOUTHWEST), INC. am 2880 Virgo Lane; Dallas. Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 FIELD DENSITY REPORT CLIENT: Coppell ISD PROJECT NO.: 0751 -2055 PROJECT: Cottonwood Elementary School, Coppell, Texas REPORT DATE: August 2, 1995 DATE.PERFORMED: July 21,1995; MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pct) Optimum Moisture (Y.) 1 Brownish red silty clay with gray clayballs 109.2 18.0 TEST RESULTS TEST PROCTOR LOCATION NO. NO. UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSITY 179 1 Sewer drainage, 25 feet south of northwest comer of gym, 50 feet west of gym, final 180 1 Sewer drainage, 35 feet south of northwest comer, 50 feet west of gym, final 108.0 18.9 98.9 106.7 20.9 97.7 Remarks: All densities meet project specifications unless otherwise noted. Bob Shea Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: SMH/br Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. a 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620.7328 FIELD DENSITY REPORT Number Description 1 Brownish red silty clay with gray clayballs Maximum Dry Density (pcf) Optimum Moisture (• /.) 109.2 18.0 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 166 1 Fire hydrant inline, 40 feet west of hydrant, 101.3 22.0 92.7 west of kitchen, 1st lift 167 1 Fire hydrant inline, 50 feet west of hydrant, 106.6 18.4 97.6 west of kitchen, 2nd lift 168 1 Fire hydrant inline, 55 feet west of hydrant, 108.9 20.5 99.7 west of kitchen, 3rd lift 169 1 Fire hydrant inline, 65 feet west of hydrant, 102.4 20.5 93.7 west of kitchen, 4th lift 170 1 Fire hydrant inline, 70 feet west of hydrant, 106.1 19.5 97.2 west of kitchen, 5th lift 171 1 Fire hydrant inline, 90 feet west of hydrant, 108.2 19.3 991 west of kitchen, 6th lift 172 1 Main sewer line, 40 feet west of gym, 40 feet 103.7 18.2 95.0 south of northwest comer, 4th lift 173 1 Main sewer line, 45 feet west of gym, 55 feet 109.2 18.3 100.0 south of northwest corner, 5th lift 174 1 Main sewer line, 55 feet west of gym, 55 feet 108.9 19.2 99.2 south of northwest comer, 6th lift 175 1 Main sewer line, 65 feet west of gym, 65 feet 109.0 17.9 99.8 south of northwest comer, 7th lift FUGRO- McCLELLAND (SOUTHWEST), INC. a 2880 Wgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620 -7328 FIELD DENSITY REPORT CLIENT: PROJECT: Coppell ISD Cottonwood Elementary School, Coppell, Texas PROJECT NO.: 0751 -2055 REPORT DATE: August 2, 1995 Page 2 DATE PERFORMED: Jul 20, 1995 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 176 1 Storm drain, 60 feet west of gym, 40 feet 98.4 20.7 90.1 south of northwest comer, 1st lift 177 1 Storm drain, 70 feet west of gym, 70 feet 103.9 16.6 95.1 south of northwest corner, 2nd lift 178 1 Storm drain, 80 feet west of gym, 65 feet 102.7 16.9 94.1 south of northwest corner, 3rd lift Remarks: Bob Shea Fugm- McClelland Technician FUGRO- MCCLELLAND (SOUTHWEST), INC. Checked by: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group -Joe Craddock