Loading...
SC-Cottonwood E9-LR 950826FUGRO- McCLELLAND (SOUTHWEST), INC. a 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620.7328 FIELD DENSITY REPORT CLIENT: CoppelllSD PROJECT: Cottonwood Elementary School, Coppell, Texas TEST RESULTS PROJECT NO.: 0751 -2055 REPORT DATE: August 26, 1995 TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 183 1 Retest of #181, dated 08/19/95 97.8 25.0 98.6 184 1 Retest of #182, dated 08/19/95 98.3 23.9 99.1 185 1 West parking lot, northeast comer, 96.4 22.8 97.2 186 1 West parking lot, west end, central, 99.8 25.9 100.6 187 1 Circle Drive at southwest radius, 98.0 25.1 98.8 188 1 Entrance to west parking lot, 80 feet from 94.6 22.7 95.4 Minyard Drive, 189 1 North parking lot drive, west end radius, 100.1 22.5 100.9 190 1 North parking lot, west end, 96.1 26.1 96.9 191 1 North parking lot drive, 30 feet west of east 96.0 23.0 96.8 end radius, 192 1 North parking lot, east end, 100.0 24.0 100.8 Remarks: All densities meet project specifications unless otherwise noted Skit) Martin Fugm- McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: SMH/br Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION SHW Group - Mike Elmore Technician Time: 2.0 hours SHW Group - Joe Craddock Density Tests: 10 FUGRO- McCLELLAND (SOUTHWEST), INC. fi 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE: August 26, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas PROJECT NO: 0751 -2055 DATE PERFORMED: August 19, 1995 Contractors on Site: K. A. Sparks Contractors, Inc. Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing Location 13/4" Sieve #4 Sieve Front of school, east end parking lot Front of school, west end parking lot Circle drive in front of school off Minyard centerline Circle drive in front of school east side Circle drive in front of school west side 100 70.4 100 63.8 100 68.0 100 66.4 100 69.0 Project Requirements: SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve David Peters Minimum 100% Minimum 60% Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/br Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION SHW Group - Mike Elmore Technician Time: 0.5 hours SHW Group - Joe Craddock Gradations: 5 FUGRO- McCLELLAND (SOUTHWEST), INC. a 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 FIELD DENSITY REPORT CLIENT: CoppelllSD PROJECT: Cottonwood Elementary School, Coppell, Texas PROJECT NO.: 0751 -2055 REPORT DATE: August 26, 1995 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pct) Optimum Moisture (• /.) 1 Light brown silty clay (Lime Treated) 99.2 22.7 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 181 1 Circle Drive around parking lot, southeast 90.6 18.4* 91.3 ** comer, final 182 1 Parking lot, southeast corner, final 82.9 27.1 83.6 ** Remarks: " Does not meet project specifications for percent moisture content. Does not meet project specifications for percent maximum dry density. David Peters Fugro - McClelland Technician SMH/br Distribution: FUGRO- McCLELLAND (SOUTHWEST), INC. Checked by: CoppelllSD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock BILLING INFORMATION Technician Time: 1.0 hours Density Tests:2 FUGRO- McCLELLAND (SOUTHWEST), INC. a m 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620.7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE: August 26 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas PROJECT NO: 0751 -2055 DATE PERFORMED: August 18,1995 Contractors on Site: K. A. Sparks Contractors, Inc. Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Percent Passing Percent Passing Location 13/4" Sieve #4 Sieve West parking lot, 20 feet north of southeast corner, 30 feet west of east side West parking lot, 30 feet south of northeast corner, 30 feet west of east side West parking lot, 40 feet east of west side, centerline of parking lot West parking lot, 70 feet north of southwest comer of parking lot, entrance drive West parking lot, 45 feet west of entrance to building, student drop off Project Requirements: SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve SDHPT Item 260.4 (1982) 3/4" Sieve Bob Shea Fugro- McClelland Technician lttIt�fB 100 80 100 74 100 78 100 74 Minimum 100% Minimum 60% FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/br Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION SHW Group - Mike Elmore Technician Time: 2.0 hours SHW Group - Joe Craddock Gradations: 5