SC-Cottonwood E9-LR 950826FUGRO- McCLELLAND (SOUTHWEST), INC. a
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620.7328
FIELD DENSITY REPORT
CLIENT: CoppelllSD
PROJECT: Cottonwood Elementary School, Coppell, Texas
TEST RESULTS
PROJECT NO.: 0751 -2055
REPORT DATE: August 26, 1995
TEST
PROCTOR
LOCATION
UNIT DRY
MOISTURE
PERCENT OF
NO.
NO.
WEIGHT
CONTENT PERCENT
MAXIMUM DENSITY
183
1
Retest of #181, dated 08/19/95
97.8
25.0
98.6
184
1
Retest of #182, dated 08/19/95
98.3
23.9
99.1
185
1
West parking lot, northeast comer,
96.4
22.8
97.2
186
1
West parking lot, west end, central,
99.8
25.9
100.6
187
1
Circle Drive at southwest radius,
98.0
25.1
98.8
188
1
Entrance to west parking lot, 80 feet from
94.6
22.7
95.4
Minyard Drive,
189
1
North parking lot drive, west end radius,
100.1
22.5
100.9
190
1
North parking lot, west end,
96.1
26.1
96.9
191
1
North parking lot drive, 30 feet west of east
96.0
23.0
96.8
end radius,
192
1
North parking lot, east end,
100.0
24.0
100.8
Remarks: All densities meet project specifications unless otherwise noted
Skit) Martin
Fugm- McClelland Technician
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked by:
SMH/br
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION
SHW Group - Mike Elmore Technician Time: 2.0 hours
SHW Group - Joe Craddock Density Tests: 10
FUGRO- McCLELLAND (SOUTHWEST), INC. fi
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 4848301; Fax (214) 620.7328
LIME STABILIZED SOIL PULVERIZATION REPORT
CLIENT: Coppell ISD REPORT DATE: August 26, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas PROJECT NO: 0751 -2055
DATE PERFORMED: August 19, 1995
Contractors on Site: K. A. Sparks Contractors, Inc.
Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below:
LIME STABILIZED SOIL PULVERIZATION TEST RESULTS
Percent Passing Percent Passing
Location 13/4" Sieve #4 Sieve
Front of school, east end parking lot
Front of school, west end parking lot
Circle drive in front of school off Minyard
centerline
Circle drive in front of school east side
Circle drive in front of school west side
100
70.4
100
63.8
100
68.0
100 66.4
100 69.0
Project Requirements:
SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve
SDHPT Item 260.4 (1982) 3/4" Sieve
David Peters
Minimum 100% Minimum 60%
Fugro - McClelland Technician FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH/br
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION
SHW Group - Mike Elmore Technician Time: 0.5 hours
SHW Group - Joe Craddock Gradations: 5
FUGRO- McCLELLAND (SOUTHWEST), INC. a
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 4848301; Fax (214) 620.7328
FIELD DENSITY REPORT
CLIENT: CoppelllSD
PROJECT: Cottonwood Elementary School, Coppell, Texas
PROJECT NO.: 0751 -2055
REPORT DATE: August 26, 1995
MOISTURE/DENSITY RELATIONS
Material Proctor Results
Number Description Maximum Dry Density (pct) Optimum Moisture (• /.)
1 Light brown silty clay (Lime Treated) 99.2 22.7
TEST RESULTS
TEST
PROCTOR LOCATION UNIT DRY
MOISTURE
PERCENT OF
NO.
NO. WEIGHT CONTENT PERCENT
MAXIMUM DENSITY
181
1 Circle Drive around parking lot, southeast 90.6
18.4*
91.3 **
comer, final
182
1 Parking lot, southeast corner, final 82.9
27.1
83.6 **
Remarks:
" Does not meet project specifications for percent moisture content.
Does not meet project specifications for percent maximum dry density.
David Peters
Fugro - McClelland Technician
SMH/br
Distribution:
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked by:
CoppelllSD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
BILLING INFORMATION
Technician Time: 1.0 hours
Density Tests:2
FUGRO- McCLELLAND (SOUTHWEST), INC. a m
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620.7328
LIME STABILIZED SOIL PULVERIZATION REPORT
CLIENT: Coppell ISD REPORT DATE: August 26 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas PROJECT NO: 0751 -2055
DATE PERFORMED: August 18,1995
Contractors on Site: K. A. Sparks Contractors, Inc.
Remarks: Pulverization/Gradation tests were performed. Locations and results are listed below:
LIME STABILIZED SOIL PULVERIZATION TEST RESULTS
Percent Passing Percent Passing
Location 13/4" Sieve #4 Sieve
West parking lot, 20 feet north of southeast
corner, 30 feet west of east side
West parking lot, 30 feet south of northeast
corner, 30 feet west of east side
West parking lot, 40 feet east of west side,
centerline of parking lot
West parking lot, 70 feet north of southwest
comer of parking lot, entrance drive
West parking lot, 45 feet west of entrance to
building, student drop off
Project Requirements:
SPECIFICATIONS: SDHPT Item 260.4 (1972) #4 Sieve
SDHPT Item 260.4 (1982) 3/4" Sieve
Bob Shea
Fugro- McClelland Technician
lttIt�fB
100 80
100 74
100 78
100 74
Minimum 100% Minimum 60%
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH/br
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION
SHW Group - Mike Elmore Technician Time: 2.0 hours
SHW Group - Joe Craddock Gradations: 5