SC-Cottonwood E9-LR 950906FUGRO-McCLELLAND (SOUTHWEST), INC. i s
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620.7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR
K A Sparks Contractors, Inc.
TICKET NO.:
309412
CONCRETE SUPPLIER:
Express Concrete
AMBIENT TEMP. (°F):
90
PLANT/TRUCK:
4/85
CONCRETE TEMP. ( °F):
96
MIX ID NUMBER.
9339
TIME BATCHED:
8:52 am
AIR ( %) (A" c -23i)
5.5
TIME SAMPLED:
9:40 am
WATER ADDED (gal):
20
WEATHER CONDITION:
Sunny
SLUMP (inches) (Ann C -143)
5"
LOCATION OF PLACEMENT:
Circle drive, around parking lot, at northwest entryway to parking lot
Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: 1�
SN"so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
a can
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620.7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR
K A Sparks Contractors, Inc.
DATE
TICKET NO.:
308509 CONCRETE SUPPLIER:
Express Concrete
AMBIENT TEMP. ( °F):
88 PLANT/TRUCK:
4/
CONCRETE TEMP. (°F):
85 MIX ED NUMBER
9339
TIME BATCHED:
unknown AIR (%) (Anm C -air)
5.5
TIME SAMPLED:
9:30 am WATER ADDED (gal):
5
WEATHER CONDITION:
slmny SLUMP (inches) (ASTM ca43)
5"
LOCATION OF PLACEMENT:
Center parking lot, north center quadrant
3000/28 days
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 2&27 square hlchea
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
( days)
TESTED
(pounds)
STRENGTH
STRENGTH
(psi)
(psi)
CWS 133
7
09/01/95
82000
2901
3000/28 days
CWS 134
28
09/22/95
CWS 135
28
09/22/95
CWS 136
Hold
S ifimtiaa:
Making & Curing:
ASTM C-31
Testing Methods:
ASTM C -143, ASTM C-39
REMARKS:
Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By: \ �l
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
FUGRO-McCLELLAND (SOUTHWEST), INC. d
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484.8301; Fax (214) 820 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR
K A Sparks Contractors, Inc.
STRENGTH
TICKET NO.:
308610 CONCRETE SUPPLIER
Express Concrete
AMBIENT TEMP. ( °F):
93 PLANT/TRUCK:
41932
CONCRETE TEMP. ( °F):
93 MIX ED NUMBER
9339
TIME BATCHED:
unknown AIR ( %) (Ann c -331)
4.0
TIME SAMPLED:
12:15 pm WATER ADDED (gal):
0
WEATHER CONDITION:
sunny SLUMP (inches) (Affrm x143)
5 1/2"
LOCATION OF PLACEMENT:
Center parking lot, south east quadrant
TESTED
f9*01;VT7 %1
Technician: David Peters FUGRO- McCLELLAND / (SOUTHWEST), INC.
Checked By:
SNfR1so
Distribution: Coppell ISD - Mickey Harper
City of Copped - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
CONCRETE CYLINDER COMPRESSIVE
STRENGTH
TESTS
Standard V x42", 28;27
gquam inches
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
( days)
TESTED
(pounds)
STRENGTH
STRENGTH
(psi)
(Psi)
CWS 137
7
09/01/95
97000
3432
3000/28 days
CWS 138
28
09/22/95
CWS 139
28
09/22/95
CWS 140
Hold
S 'ficatim :
Making & Cum •
ASTM 631 Testing Methods:
ASTM 6143, ASTM C -39
f9*01;VT7 %1
Technician: David Peters FUGRO- McCLELLAND / (SOUTHWEST), INC.
Checked By:
SNfR1so
Distribution: Coppell ISD - Mickey Harper
City of Copped - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC. a m
2880 Yrgo Lane; Dallas, Texas 75229
Ph (214) 4848301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
SAMPLE DATE: ' August 25, 195
CONTRACTOR:
K A Sparks Contractors, Inc.
TICKET NO.:
308451 CONCRETE SUPPLIER:
Express Concrete
AMBIENT TEMP. (On:
84 PLANT/TRUCK:
4/85
CONCRETE TEMP. ( °F):
80 MIX ED NUMBER
9339
TIME BATCHED:
7:25 am AIR ( %) (ASTM C -231)
5.0
TIME SAMPLED:
8:00 am WATER ADDED (gal):
18
WEATHER CONDITION:
partly cloudy (hot) SLUMP (inches) (Asrm C -t43)
4 1/2"
LOCATION OF PLACEMENT:
Center parking lot, southwest quadrant
COMPRESSIVE
REMARKS:
Technician: David Peters FUGRO-McCLELLAND ( SOUTHWEST), INC.
Checked By: <� a � 1
SMI-I/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
CONCRETE CYLINDER COMPRESSIVE
STRENGTH
TESTS
Standard b TM Y 2t' ; 28.27
square
ir ueh es
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
(days)
TESTED
(pounds)
STRENGTH
STRENGTH
(pa9
(psi)
CWS 129
7
09/01/95
95000
3361
3000/28 days
CWS 130
28
09/22/95
CWS 131
28 1
09122/95
CWS 132
Hold
Specifimfions:
Making & Curing;
ASTM C -31 Tating Medwds:
ASTM G143, ASTM C -39
REMARKS:
Technician: David Peters FUGRO-McCLELLAND ( SOUTHWEST), INC.
Checked By: <� a � 1
SMI-I/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC. a s
2880 Wrgo Lane; Dallas, Texas 75229
Ph (214) 4848301; Fax (214) 620.7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR:
K A Sparks Contractors, Inc.
STRENGTH TESTS
TICKET NO.:
309367
CONCRETE SUPPLIER:
Express Concrete
AMBIENT TEMP. (°F):
88
PLANT/TRUCK:
4/95
CONCRETE TEMP. ( °F):
86
MIX ID NUMBER.
9339
TIME BATCHED:
7:30 am
AIR ( %) (As m c -ut)
4.0
TIME SAMPLED:
8:00 am
WATER ADDED (gal):
10
WEATHER CONDITION:
sunny
SLUMP (inches) (Asrm ca43)
4 1/2"
LOCATION OF PLACEMENT:
Circle drive, around parking lot at southeast comer of parking lot
REMARKS:
Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: �� \
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
CONCRETE CYLINDER COAVRESSIVE
STRENGTH TESTS
Standar &
e z 121
squaw
inches
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
( days)
TESTED
(pounds)
STRENGTH
STRENGTH
(Psi)
(psi)
CWS 141
7
09/05/95
88000
3113
3000/28 days
CWS 142
28
09/26/95
CWS 143
28
09/26/95
CWS 144
Hold
Spwifimfions:
Malcing & Curing:
ASTM C -31
Testing Mdhods:
ASTM G143, ASTM C-39
REMARKS:
Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: �� \
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock