SC-Cottonwood E9-LR 950916FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the North parking lot off Minyard following location: Time placement began: 7:00 am Time placement ended: 1:00 pm Total cubic yards placed: 250 Slump range (inches): 4 Slump required (inches): 5 Concrete supplier and plant: Express/4 Concrete temperature range ( °F): 82 °F Strength required (psi/days): 3000/28 Number of cylinders made: 8 Superplasticizer used: No It started raining at 10:54 am. No plastic was placed over the slab, but approximately 25 % of the curb was covered with plastic. At 11:35 am more plastic was brought to the job site and covered the rest of the curb only. The north parking lot from the circle drive entryway and the first 30 feet into the parking lot, concrete was placed in a heavy downpour. This area was observed to have standing water after approximately I hour of twin. Approximately 110 -120 feet on the circle drive from Minyard at east entryway there were numerous large clayballs on the placement. At the first crosswalk (east tc west) from parking to circle drive there is a cold joint. David Peters Fugro- McClelland Technician FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: A— SMH/br Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Contractors, Inc. - E. J. Williams BILLING INFORMATION SHW Group - Mike Elmore Technician Time: 7.0 hours SHW Group - Joe Craddock Cylinders: 8