SC-Cottonwood E9-LR 950920FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 20, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 12,1995 CONTRACTOR K A Sparks Contractors, Inc. TICKET NO.: 313490 CONCRETE SUPPLIER Express AMBIENT TEMP. (°F): 70 PLANT/TRUCK: 4/85 CONCRETE TEMP. ( °F): 82 MIX ID NUMBER 9339 TIME BATCHED: 7:21 am AIR ( %) (As m c -23i) 3.5 TIME SAMPLED: 8:00 am WATER ADDED (gal): 5 WEATHER CONDITION: partly cloudy SLUMP (inches) (ASTM C -i43) 4" LOCATION OF PLACEMENT: North parking lot, 50 feet west of northeast comer, off of Minyard (psi) REMARKS: Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 2&2T square Wehea !. CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 185 7 09/19/95 90000 3184 3000/28 days CWS 186 28 10/10/95 CWS 187 28 10/10/95 CWS 188 Hold specifications: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. a m 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 20, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 $AMPLE DATE: September 12, 1995 CONTRACTOR K A Sparks Contractors, Inc. TESTS TICKET NO.: 313557 CONCRETE SUPPLIER Express AMBIENT TEMP. ( °F): 78 PLANT/TRUCK- 4/85 CONCRETE TEMP. ( °F): 86 MIX ED NUMBER 9339 TIME BATCHED: 8:53 am AIR ( %) (As m c -231) 4.5 T AE SAMPLED: 9:30 am WATER ADDED (gal): 5 WEATHER CONDITION: partly cloudy SLUMP (inches) (As m c -r43) 4" LOCATION OF PLACEMENT: North parking lot, 130 feet east of northwest entry way, off of Minyard REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock M CONCRETE CYLINDER COPRESSIVE STREIIGTT� TESTS Standard 6* :12' ; 28.27 bquarr hrch« CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 189 7 09/19/95 103000 3644 3000/28 da s CWS 190 28 10/10/95 CWS 191 28 10/10/95 CWS 192 Hold s catims: Making & Curing: ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock