SC-Cottonwood E9-LR 950920FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 20, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
SAMPLE DATE: September 12,1995
CONTRACTOR
K A Sparks Contractors, Inc.
TICKET NO.:
313490
CONCRETE SUPPLIER
Express
AMBIENT TEMP. (°F):
70
PLANT/TRUCK:
4/85
CONCRETE TEMP. ( °F):
82
MIX ID NUMBER
9339
TIME BATCHED:
7:21 am
AIR ( %) (As m c -23i)
3.5
TIME SAMPLED:
8:00 am
WATER ADDED (gal):
5
WEATHER CONDITION:
partly cloudy
SLUMP (inches) (ASTM C -i43)
4"
LOCATION OF PLACEMENT:
North parking lot, 50 feet west of northeast comer, off of Minyard
(psi)
REMARKS:
Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 2&2T square
Wehea !.
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
(days)
TESTED
(pounds)
STRENGTH
STRENGTH
(psi)
(psi)
CWS 185
7
09/19/95
90000
3184
3000/28 days
CWS 186
28
10/10/95
CWS 187
28
10/10/95
CWS 188
Hold
specifications:
Making & Curing:
ASTM C -31
Testing Methods: ASTM C -143, ASTM C -39
REMARKS:
Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC. a m
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484.8301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: September 20, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
$AMPLE DATE: September 12, 1995
CONTRACTOR
K A Sparks Contractors, Inc.
TESTS
TICKET NO.:
313557
CONCRETE SUPPLIER
Express
AMBIENT TEMP. ( °F):
78
PLANT/TRUCK-
4/85
CONCRETE TEMP. ( °F):
86
MIX ED NUMBER
9339
TIME BATCHED:
8:53 am
AIR ( %) (As m c -231)
4.5
T AE SAMPLED:
9:30 am
WATER ADDED (gal):
5
WEATHER CONDITION:
partly cloudy
SLUMP (inches) (As m c -r43)
4"
LOCATION OF PLACEMENT:
North parking lot, 130 feet east of northwest entry way, off of Minyard
REMARKS:
Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
M
CONCRETE CYLINDER COPRESSIVE STREIIGTT�
TESTS
Standard 6* :12' ; 28.27 bquarr
hrch«
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
(days)
TESTED
(pounds)
STRENGTH
STRENGTH
(psi)
(psi)
CWS 189
7
09/19/95
103000
3644
3000/28 da s
CWS 190
28
10/10/95
CWS 191
28
10/10/95
CWS 192
Hold
s catims:
Making & Curing:
ASTM C-31 Testing Methods:
ASTM C-143, ASTM C-39
REMARKS:
Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock