SC-Cottonwood E9-LR 950925FUGRO-McCLELLAND (SOUTHWEST), INC. a 2880 Virgo Lane; Online, Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 25, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 14, 1985 CONTRACTOR: K A Sparks Contractors, Inc. TESTS TICKET NO.: 313977 CONCRETE SUPPLIER Express Concrete AMBIENT TEMP. ( °F): 82 PLANT/TRUCK: 4/385 CONCRETE TEMP. ( °F): 88 MIX ID NUMBER 9339 TIME BATCHED: 8:28 am AIR ( %) (AaM C -231) 6 TIME SAMPLED: 9:30 am WATER ADDED (gal): 10 WEATHER CONDITION: partly cloudy SLUMP (inches) (As m c -143) 5 1/2' LOCATION OF PLACEMENT: Circle drive, west entry 135 feet from N inyard TESTED REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 0 % Y2 ", 28.27 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 197 7 09/21/95 86000 3043 3000 /28 days CWS 198 28 10/12/95 CWS 199 28 10/12/95 CWS 200 Hold S 'fications: Making & Curing: ASTM C-31 Testing Methods: ASTM C -143, ASTM C-39 REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date: September 25, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 14, 1995 CONTRACTOR K A Sparks Contractors, Inc. TESTS TICKET NO.: 313934 CONCRETE SUPPLIER Express Concrete AMBIENT TEMP. ( °F): 78 PLANT/TRUCK: 4/ CONCRETE TEMP. ( °F): 84 MIX ID NUMBER: 9339 TIME BATCHED: 7:05 am AIR ( %) (As m c -zit) 5 TIME SAMPLED: 8:00 am WATER ADDED (gal): 10 WEATHER CONDITION: partly cloudy SLUMP (inches) (Ann c -i43) 4 1/2" LOCATION OF PLACEMENT: Circle drive around, north parking lot at west end crossover STRENGTH Technician: David Peters FUGRO-MCCLELLAND (SOUTHWEST), INC. Checked By: �\� SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 7 1 lE "; 28 2t square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 193 7 09/21/95 87000 3078 3000/28 days CWS 194 28 10/12/95 CWS 195 28 10/12/95 CWS 196 Hold specifications: Making & Curin . ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 Technician: David Peters FUGRO-MCCLELLAND (SOUTHWEST), INC. Checked By: �\� SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. a m 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 25, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: August 25, 1995 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc. 308610 CONCRETE SUPPLIER: 93 PLANT/TRUCK: 93 MkL V 11� Ry"4' 1111, unknown AIR ( % ) (ASTM C -231) 12:15 pm WATER ADDED (gal): sunny SLUMP (inches) (ASTM C -143) Center parking lot, south east quadrant Express Concrete 4/932 9339 4.0 0 5 1/2" CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6^ x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 137 7 09/01/95 97000 3432 3000/28 days CWS 138 28 09/22/95 123000 4351 CWS 139 28 09/22/95 120000 1 4241 CWS 140 Hold S ifications: Making & Curing: ASTM C -31 Twing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock A N own FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 820 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT: Cottonwood Elementary School, Coppell, Texas Report Date: September 25, 1995 Project No.: 0751 -2055 F SAMPLE DATE: August 25, 1995 1 CONTRACTOR- TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc 308451 CONCRETE SUPPLIER: 84 PLANT/TRUCK: 80 MIX ED NUMBER: 7:25 am AIR ( %) (ASTM C -231) 8:00 am WATER ADDED (gal): partly cloudy (hot) SLUMP (inches) (ASTM Ca43) Center parking lot, southwest quadrant Express Concrete 4/85 9339 5.0 18 4 1/2" CONCRETE CYLINDER: COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 129 7 09/01/95 95000 3361 3000/28 days CWS 130 28 09/22/95 118000 4175 CWS 131 28 09/22/95 1 121000 1 4281 CWS 132 Hold Hold Specificatiw ; Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: David Peters FUGRO- McCLELLAND INC. Checked By: SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. a 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 25, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: August 25, 1995 CONTRACTOR: K A Sparks Contractors, Inc. AGE (days) TICKET NO.: 308509 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 88 PLANT/TRUCK: 4/ CONCRETE TEMP. (°F): 85 MIX ID NUMBER: 9339 TIME BATCHED: unknown AIR ( %) (ASTM C -231) 5.5 TIME SAMPLED: 9:30 am WATER ADDED (gal): 5 WEATHER CONDITION: sunny SLUMP (inches) (ASTM C -143) 5" LOCATION OF PLACEMENT: Center parking lot, north center quadrant 1 4422 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 133 7 09/01/95 82000 2901 3000/28 days CWS 134 28 09/22/95 128000 4528 CWS 135 1 28 1 09/22/95 1 125000 1 4422 CWS 136 Hold I Hold 5 ifimtiom: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: 1a \v SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock