Loading...
SC-Cottonwood E9-LR 950927FUGRO- McCLELLAND (SOUTHWEST), INC. a m 2880 Virgo lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 27, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE D ATE: August 29, 1995 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc. 309367 CONCRETE SUPPLIER: Express Concrete 88 PLANT/TRUCK: 4/95 86 MIX ID NUMBER: 9339 7:30 am AIR ( %) (ASTM C -231) 4.0 8:00 am WATER ADDED (gal): 10 sunny SLUMP (inches) (ASTM c -143) 4 1/2" Circle drive, around parking lot at southeast corner of parking lot CONCRETE` CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6^ x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIl2ED COMPRESSIVE STRENGTH (psi) CWS 141 7 09/05/95 88000 3113 3000/28 days CWS 142 28 09/26/95 109000 3856 CWS 143 28 09/26/95 106000 3750 CWS 144 Hold Hold specifications: Making & Curin : ASTM C-31 Testing Methods: ASTM C -143. ASTNt C -39 REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: 4 :� t' 0 SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock �ORO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: September 27, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: Augus 29,' 1995 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc 309412 CONCRETE SUPPLIER: Express Concrete 90 PLANT /TRUCK: 4/85 96 MIX ID NUMBER: 9339 8:52 am AIR ( %) (ASTM C -231) 5.5 9:40 am WATER ADDED (gap: 20 sunny SLUMP (inches) (ASTM c -143) 5" Circle drive, around parking lot, at northwest entryway to parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 "'a 12"; 28.27 square inches -- CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUERED COMPRESSIVE STRENGTH (psi) CWS 145 7 09/05/95 76000 3396 3000/28 days CWS 146 28 09/26/95 105000 3715 CWS 147 28 09/26/95 107000 3785 CWS 148 Hold Hold Specificati ons: Makin & Curin : ASTM C -31 Testing Methods: ASTM C -143. ASTM C -39 I tM Technician: David Peters FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: SN - SMIVrm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock