Loading...
SC-Cottonwood E9-LR 951003FUGRO- McCLELLAND (SOUTHWEST), INC. 6R0 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 3, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 5, 1995 CONTRACTOR: K A Sparks Contractors, Inc. AGE (days) TICKET NO.: 311310 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 95 PLANT /TRUCK: 4/565 CONCRETE TEMP. ( °F): 95 MIX ID NUMBER: 9339 -5 TIME BATCHED: 10:55 am AIR ( %) (ASTM C -231) 5.0 TIME SAMPLED: 11:30 am WATER ADDED (gal): 10 WEATHER CONDITION: clear SLUMP (inches) (AsTM c -143) 4 3/4" LOCATION OF PLACEMENT: Paving- Fire Lane, north northwest entrance, 5 feet south of Minyard Drive and 10 feet east of west curb CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6 1 ' a 12 ", square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 165 7 09/12/95 83000 2936 3000/28 days CWS 166 28 10/03/95 111000 3927 CWS 167 1 28 1 10/03/95 107000 1 3785 CWS 168 1 Hold _ S ifications: Makin g& Curing: ASTM C -31 Tessiiig Methods: ASTM C -143. ASTM C -39 REMARKS: Technician: Todd Neely FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: yl SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484.8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 3, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 5, 1995 CONTRACTOR: K A Sparks Contractors, Inc. AGE (days) TICKET NO.: 311338 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 97 PLANT /TRUCK: 4/525 CONCRETE TEMP. ( °F): 95 MIX ID NUMBER: 9339 -5 TIME BATCHED: 11:50 am AIR ( %) (ASTM C -231) 5.0 TIME SAMPLED: 12:45 pm WATER ADDED (gal): 10 WEATHER CONDITION: clear SLUMP (inches) (AsTM c -143) 5" LOCATION OF PLACEMENT: Paving: fire lane, 170 feet south of Minyard Drive and 80 feet east of west curb line CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ",28.27'square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (Psi) CWS 169 7 09/12/95 84000 2972 3000/28 days CWS 170 28 10/03/95 112000 3962 CWS 171 28 1 10/03/95 1 109000 3856 CWS 172 Hold S rim ions: Making & Curing: ASTM C -31 Teging Methods: AST %t C-143. ASTM C -39 REMARKS: Technician: Todd Neely FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock