Loading...
SC-Cottonwood E9-LR 951004tiaR0 FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 4, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 26, 1995 CONTRACTOR K A Sparks Contractors, Inc. COMPRESSIVE STRENGTH TESTS TICKET NO.: 317169 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 68 PLANT/TRUCK: 4/483 CONCRETE TEMP. ( °F): 75 MIX ID NUMBER 9339 TIME BATCHED: 9:40 am AIR ( %) (As m c -231) TIME SAMPLED: 10:05 am WATER ADDED (gal): 5 WEATHER CONDITION: cloudy and cool SLUMP (inches) (ASTM c -143) 5 LOCATION OF PLACEMENT: Paving: slab at northwest approach road to Minyard Street (days) REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SNIHISO Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 "r 2817 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 233 7 10/03/95 98000 3467 3000/28 days CWS 234 28 10/24/95 CWS 235 28 10/24/95 CWS 236 Hold Specifications: Making & Curing: ASTM Gal Teding Methods: ASTM 4143, ASTM 439 REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SNIHISO Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- MCCLELLAND (SOUTHWEST), INC. a m 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 4, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 CONTRACTOR: K A Sparks Contractors, Inc. TICKET NO.: 317215 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 68 PLANT/TRUCK: 4/483 CONCRETE TEMP. ( °F): 76 MIX ID NUMBER: 9339 TIME BATCHED: 10:47 am AIR ( %) (AsTM c -zit) AGE TIME SAMPLED: 11:10 am WATER ADDED (gal): 5 WEATHER CONDITION: cloudy and cool SLUMP (inches) (As m c -i43) 5 LOCATION OF PLACEMENT: Paving at northeast approach road to Minyard Street STRENGTH: 1331aFill (cl Technician: Neil Rana FUGRO - MCCLELLAND (SOUTHWEST), INC. Checked By: 1� SA"so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard e r 12 ", 2&2 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH: STRENGTH (psi) (psi) CWS 237 7 10/03/95 97000 3422 3000/28 days CWS 238 28 10/24/95 CWS 239 28 10/24/95 CWS 240 Hold S ' imtions: Making & Curing: ASTM C -31 Testing Methods: ASTM C-143, ASTM C -39 1331aFill (cl Technician: Neil Rana FUGRO - MCCLELLAND (SOUTHWEST), INC. Checked By: 1� SA"so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock