SC-Cottonwood E9-LR 951004tiaR0
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 4, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
SAMPLE DATE: September 26, 1995
CONTRACTOR
K A Sparks Contractors, Inc.
COMPRESSIVE STRENGTH TESTS
TICKET NO.:
317169 CONCRETE SUPPLIER:
Express Concrete
AMBIENT TEMP. ( °F):
68 PLANT/TRUCK:
4/483
CONCRETE TEMP. ( °F):
75 MIX ID NUMBER
9339
TIME BATCHED:
9:40 am AIR ( %) (As m c -231)
TIME SAMPLED:
10:05 am WATER ADDED (gal):
5
WEATHER CONDITION:
cloudy and cool SLUMP (inches) (ASTM c -143)
5
LOCATION OF PLACEMENT:
Paving: slab at northwest approach road to Minyard Street
(days)
REMARKS:
Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SNIHISO
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
CONCRETE CYLINDER
COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 "r 2817
square
inches
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
(days)
TESTED
(pounds)
STRENGTH
STRENGTH
(psi)
(psi)
CWS 233
7
10/03/95
98000
3467
3000/28 days
CWS 234
28
10/24/95
CWS 235
28
10/24/95
CWS 236
Hold
Specifications:
Making & Curing:
ASTM Gal Teding Methods:
ASTM 4143, ASTM 439
REMARKS:
Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By:
SNIHISO
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
FUGRO- MCCLELLAND (SOUTHWEST), INC. a m
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 4, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR:
K A Sparks Contractors, Inc.
TICKET NO.:
317215 CONCRETE SUPPLIER:
Express Concrete
AMBIENT TEMP. ( °F):
68 PLANT/TRUCK:
4/483
CONCRETE TEMP. ( °F):
76 MIX ID NUMBER:
9339
TIME BATCHED:
10:47 am AIR ( %) (AsTM c -zit)
AGE
TIME SAMPLED:
11:10 am WATER ADDED (gal):
5
WEATHER CONDITION:
cloudy and cool SLUMP (inches) (As m c -i43)
5
LOCATION OF PLACEMENT:
Paving at northeast approach road to Minyard Street
STRENGTH:
1331aFill (cl
Technician: Neil Rana FUGRO - MCCLELLAND (SOUTHWEST), INC.
Checked By: 1�
SA"so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard e r 12 ", 2&2 square
inches
CYLINDER
AGE
DATE
TOTAL LOAD
COMPRESSIVE
REQUIRED COMPRESSIVE
NUMBER
(days)
TESTED
(pounds)
STRENGTH:
STRENGTH
(psi)
(psi)
CWS 237
7
10/03/95
97000
3422
3000/28 days
CWS 238
28
10/24/95
CWS 239
28
10/24/95
CWS 240
Hold
S ' imtions:
Making & Curing:
ASTM C -31
Testing Methods: ASTM C-143, ASTM C -39
1331aFill (cl
Technician: Neil Rana FUGRO - MCCLELLAND (SOUTHWEST), INC.
Checked By: 1�
SA"so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock