SC-Cottonwood E9-LR 951006FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 4848301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR:
K A Sparks Contractors, Inc.
TICKET NO.:
176993
CONCRETE SUPPLIER
Express Concrete
AMBIENT TEMP. ( °F):
67
PLANT/TRUCK:
4/562
CONCRETE TEMP. (°F):
70
MIX ID NUMBER
9339
TIME BATCHED:
6:50 am
AIR ( %) (Ann c -231)
TIME SAMPLED:
7:50 am
WATER ADDED (gal):
5
WEATHER CONDITION:
cloudy
SLUMP (inches) (AsTm c -i43)
5
LOCATION OF PLACEMENT:
Kitchen driveway paving
REMARKS:
Technician:
SMH/
Distribution:
FUGRO- McCLELLAND (SOUTHWEST), INC.
Checked By: c' IT
Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 484 -8301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
SAMPLE DATE: September 28, 1995
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. (°F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
K A Sparks Contractors, Inc.
177002
CONCRETE SUPPLIER
70
PLANT/TRUCK:
72
MIX D) NUMBER
8:15 am
AIR ( %) (Ann c -asr)
8:40 am
WATER ADDED (gal):
cloudy
SLUMP (inches) (AsTM ca43)
Paving: 200 feet north of kitchen driveway
Express Concrete
4/525
9339
Iffy* 5 F.1;1:( A
Technician: Neil Rana FUGRO-McCLELLAND (SOUTHWEST), INC.
Checked By: S 1�
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock
2GRO
FUGRO- McCLELLAND (SOUTHWEST), INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (214) 4848301; Fax (214) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: October 6, 1995
PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. ( °F):
CONCRETE TEMP. ( °F):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
REMARKS:
K A Sparks Contractors, Inc.
177011
CONCRETE SUPPLIER:
Express Concrete
76
PLANT/TRUCK:
4/94
79
MIX ID NUMBER
9339
9:30 am
AIR ( %) (Ann c -231)
10:00 am
WATER ADDED (gal):
5
cloudy
SLUMP (inches) (As m c -143)
5
Paving: slab at 400 feet north of kitchen driveway
Technician: Neil Rana FUGRO McCLELLAND INC.
Checked By: \ 1
SMH/so
Distribution: Coppell ISD - Mickey Harper
City of Coppell - Garreth Campbell
K A Sparks Construction, Inc. - E. J. Williams
SHW Group - Mike Elmore
SHW Group - Joe Craddock