Loading...
SC-Cottonwood E9-LR 951006FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 6, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 CONTRACTOR: K A Sparks Contractors, Inc. TICKET NO.: 176993 CONCRETE SUPPLIER Express Concrete AMBIENT TEMP. ( °F): 67 PLANT/TRUCK: 4/562 CONCRETE TEMP. (°F): 70 MIX ID NUMBER 9339 TIME BATCHED: 6:50 am AIR ( %) (Ann c -231) TIME SAMPLED: 7:50 am WATER ADDED (gal): 5 WEATHER CONDITION: cloudy SLUMP (inches) (AsTm c -i43) 5 LOCATION OF PLACEMENT: Kitchen driveway paving REMARKS: Technician: SMH/ Distribution: FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: c' IT Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 6, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 28, 1995 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc. 177002 CONCRETE SUPPLIER 70 PLANT/TRUCK: 72 MIX D) NUMBER 8:15 am AIR ( %) (Ann c -asr) 8:40 am WATER ADDED (gal): cloudy SLUMP (inches) (AsTM ca43) Paving: 200 feet north of kitchen driveway Express Concrete 4/525 9339 Iffy* 5 F.1;1:( A Technician: Neil Rana FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: S 1� SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock 2GRO FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 6, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: REMARKS: K A Sparks Contractors, Inc. 177011 CONCRETE SUPPLIER: Express Concrete 76 PLANT/TRUCK: 4/94 79 MIX ID NUMBER 9339 9:30 am AIR ( %) (Ann c -231) 10:00 am WATER ADDED (gal): 5 cloudy SLUMP (inches) (As m c -143) 5 Paving: slab at 400 feet north of kitchen driveway Technician: Neil Rana FUGRO McCLELLAND INC. Checked By: \ 1 SMH/so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock