Loading...
SC-Cottonwood E9-LR 951011FUGRO-McCLELLAND (SOUTHWEST), INC. a 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 11, 1995 PROTECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAM PLE DATE: September 12, 1995 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( ° F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors. Inc 313490 CONCRETE SUPPLIER: Express 70 PLANT /TRUCK: 4/85 82 MIX ID NUMBER: 9339 7:21 am AIR ( %) (ASTnI C -231) 3.5 8:00 am WATER ADDED (gal): 5 partly cloudy SLUMP (inches) (ASTNI C -143) 4" North parking lot, 50 feet west of northeast corner, off of Minyard CWS 187 1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" c 12 ", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 185 7 09/19/95 90000 3184 3000/28 days CWS 186 28 10/10/95 113500 4015 CWS 187 1 28 10/10/95 115000 4068 CWS 188 Hold S ifimlions: Making & Curing: ASTM C -31 Tessing Methods: ASTM C -143. ASTM C39 REMARKS: Technician: David Peters FUGRO- McCLELLAND (SOUTHWEST), INC. Checked Bv: SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 4848301; Fax (214) 620.7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: October 11, 1995 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: September 12, 1995 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ff): CONCRETE TEMP. ( TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc 313557 CONCRETE SUPPLIER: Express 78 PLANTITRUCK: 4/85 86 MIX ID NUMBER: 9339 8:53 am AIR ( %) (ASTM C -231) 4.5 9:30 am WATER ADDED (gal): 5 partly cloudy SLUMP (inches) (ASTM C -143) 4" North parking lot. 130 feet cast of northwest entry way, off of Minyard CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 189 7 09/19/95 103000 3644 3000/28 days CWS 190 28 10/10/95 133000 4705 CWS 191 28 10/10/95 135000 4776 CWS 192 Hold Specific ions: Making & Curing: ASTM C -31 Teuing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: David Peters FUGRO McCLELLAND (SOUTHWEST), INC. Checked Bv: S )� SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppcll - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock