Loading...
SC-Cottonwood E9-LR 951027FUGRO- McCLELLAND (SOUTHWEST), INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 820 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: CoppellISD PROJECT: Cottonwood Elementary School, Coppell, Texas Report Date: October 27, 1995 Project No.: 0751 -2055 CONTRACTOR K A Sparks Contractors, Inc. TICKET NO.: 176993 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 67 PLANT/TRUCK: 4/562 CONCRETE TEMP. ( °F): 70 MIX ED NUMBER: 9339 TIME BATCHED: 6:50 am AIR ( %) (AsTM c -231) COMPRESSIVE TIME SAMPLED: 7:50 am WATER ADDED (gal): 5 WEATHER CONDITION: cloudy SLUMP (inches) (AsTm c -tai) 5 LOCATION OF PLACEMENT: Kitchen driveway paving (psi) ['I-* i f \:VIyi Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: s. SNIH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CY'LENDER COMPRESSTUE STRENGTH TESTS Standard 6" z I2 ^,28.27 square. inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER ( days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 265 7 10/05/95 79000 2794 3000 /28 days CWS 266 28 10/26/95 107000 3785 CWS 267 28 10/26/95 105000 3715 CWS 268 Hold S Making & Cum g: ASTM C -31 Testing Methods: ASTM C -143, ASTM C-39 ['I-* i f \:VIyi Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: s. SNIH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT: Cottonwood Elementary School, Coppell, Texas Report Date: October 27, 1995 Project No.: 0751 -2055 CONTRACTOR K A Sparks Contractors, Inc. CYLINDER COMPRESSIVE STRENGTH TICKET NO.: 177011 CONCRETE SUPPLIER: Express Concrete AMBIENT TEMP. ( °F): 76 PLANT/TRUCK- 4/94 CONCRETE TEMP. (°F): 79 MIX ED NUMBER: 9339 TIME BATCHED: 9:30 am AIR ( %) (As m c -23r) CYLINDER TIME SAMPLED: 10:00 am WATER ADDED (gal): 5 WEATHER CONDITION: cloudy SLUMP (inches) (As m C -t43) 5 LOCATION OF PLACEMENT: Paving: slab at 400 feet north of kitchen driveway (pounds) REMARKS: Technician: Neil Rana FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: V\ a SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell — K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" z 12" , 28.27 square inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 273 7 10/05/95 80000 2830 3000/28 days CWS 274 28 10/26/95 112000 3962 CWS 275 28 1 10/26/95 1 110000 3892 CWS 276 Hold 3 ' catiora: Making & Curing: ASTM C -31 Testing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Neil Rana FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: V\ a SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell — K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock FUGRO- McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT: Cottonwood Elementary School, Coppell, Texas Report Date: October 27, 1995 Project No.: 0751 -2055 CONTRACTOR: K K A Sparks Contractors, Inc. TICKET NO.: 1 177002 CONCRETE SUPPLIER: E Express Concrete AMBIENT TEMP. ( °F): 7 70 PLANT/TRUCK: 4 4/525 CONCRETE TEMP. (OF): 7 72 MIX ED NUMBER 9 9339 TIME BATCHED: 8 8:15 am AIR ( %) (Asrm c -23i) TIME SAMPLED: 8 8:40 am WATER ADDED (gal): WEATHER CONDITION: c cloudy SLUMP (inches) (AsTm c -143) 5 5 LOCATION OF PLACEMENT: P Paving: 200 feet north of kitchen driveway COMPRESSNE. STRENGTH TESTS" Uilmdard 6" x 12 ^, 28.27 square incites CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) CWS 269 7 10/05/95 92000 3254 3000/28 da s CWS 270 28 10/26/95 115000 4068 CWS 271 28 10/26/95 113000 3998 CWS 272 Hold specifications: Makine & Curinc ASTM C -31 Teding Methods: ASTM C-143, ASTM C-39 REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH1so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock REMARKS: Technician: Neil Rana FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: SMH1so Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock