Loading...
SC-Cottonwood E9-LR 960222FUGRO- McCLELLAND (SOUTHWEST), INC. 2860 Virgo Lane; Dallas, Texas 75229 Ph (214) 484 -8301; Fax (214) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: February 22, 1996 PROJECT: Cottonwood Elementary School, Coppell, Texas Project No.: 0751 -2055 SAMPLE DATE: January 24, 1996 CONTRACTOR TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K A Sparks Contractors, Inc. 348585 CONCRETE SUPPLIER 50 PLANT /TRUCK: 50 h S i E'er 11721 1:I 110 9:27 am AIR ( %) ( ASTM C -231) 9:55 am WATER ADDED (gal): 0 Clear SLUMP (inches) (ASTM c -143) 6 Sidewalk along north side of project bordering Minyard Road, east of intersection of Minyard and Fairview Court Express Concrete 4/94 9339 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" z 12", 28:27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) REQUIRED COMPRESSIVE STRENGTH (psi) CWS 317 7 01/31/96 73500 2600 3000 /28 days CWS 318 28 02/21/96 90000 3184 CWS 319 1 28 02/21/96 96000 3396 CWS 320 Hold specifimfions: Makin g& Curin : ASTM C -31 Tessing Methods: ASTM C -143, ASTM C -39 REMARKS: Technician: Hal Patterson FUGRO- McCLELLAND (SOUTHWEST), INC. Checked By: 5 W SMH/rm Distribution: Coppell ISD - Mickey Harper City of Coppell - Garreth Campbell K A Sparks Construction, Inc. - E. J. Williams SHW Group - Mike Elmore SHW Group - Joe Craddock Express Concrete - Jim Ellis