Loading...
Valley R Baptist 2-CS030903T H E C 1 T Y O F September 3, 2003 Charley Campbell Rogers- O'Brien Construction Co. 11145 Morrison Lane Dallas, TX 75204 Z�� /Q� Z-3oe/ RE: Valley Ranch Baptist Church Final Walk -thm Dear Mr. Riley: Please be advised that a walk - through has been scheduled for Thursday, September 4, 2003 at 8:30 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972 - 304 -7090 at your earliest convenience. Sincerely, d" Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Jim Riley, P.E. , Brockette- Davis -Drake 2_141924- U 6 `f