Loading...
SC-Town Center E8-CS 930415CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT HEARTZ ROAD ELEMENTARY SCHOOL - PRELIMINARY PLAT P & Z HEARING DATE: April 15, 1993 C. C. HEARING DATE: May 11, 1993 (Originally heard on March 18, 1993, and denied) LOCATION: Southwest comer of Parkway Boulevard and Heartz Road. SIZE OF AREA: 10 acres (approximately) REQUEST: Approval of a preliminary plat of the Heartz Road Elementary School. APPLICANT: Coppell ISD (Owner) Mr. Buddy Echols, Superintendent 200 Denton Tap Road Coppell, TX 75019 (214) 471 -1111 Ayres & Associates (Engineer) Mr. Robert Howman 2110 Walnut Hill Lane Suite #134 Irving, TX (214) 570 -5577 HISTORY: There has been no recent subdivision activity on the subject tract, although a new, single - family subdivision is being developed east of Heartz Road (Parks of Coppell) and north of Parkway Boulevard (Stonemeade Estates). This plat was originally heard by the Planning Commission on March 18, was denied at that time - hence, this resubmittal. TRANSPORTATION: Parkway Boulevard is an improved C41), four lane divided thoroughfare in a 90 -110' right -of -way. Heartz Road is an improved C2U, two lane undivided road contained within a 60' right -of -way. ITEM 6 SURROUNDING LAND USE & ZONING: North - vacant; TC South - library site; TC East - developing single - family residential; SF -7 West - vacant & City Hall; TC COMPREHENSIVE PLAN: The Comprehensive Plan shows town center uses as most appropriate and schools (public buildings) are allowed by right. ANALYSIS: The attached plat and accompanying documentation illustrate the development proposal for the Heartz Road school site. Because this is a preliminary plat, staff was primarily concerned with siting of the school, setbacks, traffic flow, parking and the way this development fits into the overall Town Center Plan. For the most part, this proposal meets all our basic requirements - drainage issues will be addressed at final, the traffic analysis is being reviewed, and the School District has agreed to reserve a 42' wide strip on the west side of the Library site for additional Library parking. The major issue to be resolved is whether the ring road concept is still viable, given the massive changes to Town Center land use since the original plan was submitted. Staff will be prepared to discuss all these issues at the public hearing, and currently sees no major reasons for not supporting the preliminary plat. ADDENDA: This plat was denied by the Planning Commission on March 18 for several reasons, including lack of advance Traffic Study (report is included here), the uncertainty of the ring road concept (City Council indicated a desire to retain the ring road on March 23), absence of dedication for the ring road (now shown as 30 feet on this plat), and a question regarding the number of parking spaces (which will be discussed at the April 15 meeting). Because those concerns have been addressed, staff recommends approval of the preliminary plat. ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat 3) Modify the preliminary plat ATTACHMENTS: 1) Preliminary Plat 2) Site Plan 3) Landscape Plan 4) Traffic Study hrtz.stf CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT HEARTZ ROAD ELEMENTARY SCHOOL - PRELIMINARY PLAT P & Z HEARING DATE: March 18, 1993 C. C. HEARING DATE: April 13, 1993 LOCATION: Southwest corner of Parkway Boulevard and Heartz Road. SIZE OF AREA: 10 acres (approximately) REQUEST: Approval of a preliminary plat of the Heartz Road Elementary School. APPLICANT: Coppell ISD (Owner) Mr. Buddy Echols, Superintendent 200 Denton Tap Road Coppell, TX 75019 (214) 471 -1111 Ayres & Associates (Engineer) Mr. Robert Howman 2110 Walnut Hill Lane Suite 11134 Irving, TX (214) 570 -5577 HISTORY: There has been no recent subdivision activity on the subject tract, although a new, single - family subdivision is being developed east of Heartz Road (Parks of Coppell) and north of Parkway Boulevard (Stonemeade Estates). TRANSPORTATION: Parkway Boulevard is an improved C413, four lane divided thoroughfare in a 90 -110' right -of -way. Heartz Road is an improved C2U, two lane undivided road contained within a 60' right -of -way. SURROUNDING LAND USE & ZONING: North - vacant; TC South - library site; TC East - developing single - family residential; SF -7 West - vacant & City Hall; TC ITEM 8 COMPREHENSIVE PLAN: The Comprehensive Plan shows town center uses as most appropriate and schools (public buildings) are allowed by right. ANALYSIS: The attached plat and accompanying documentation illustrate the development proposal for the Heartz Road school site. Because this is a preliminary plat, staff was primarily concerned with siting of the school, setbacks, traffic flow, parking and the way this development fits into the overall Town Center Plan. For the most part, this proposal meets all our basic requirements - drainage issues will be addressed at final, the traffic analysis is being reviewed, and the School District has agreed to reserve a 42' wide strip on the west side of the Library site for additional Library parking. The major issue to be resolved is whether the ring road concept is still viable, given the massive changes to Town Center land use since the original plan was submitted. Staff will be prepared to discuss all these issues at the public hearing, and currently sees no major reasons for 1 not supporting the preliminary plat. 1 { ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat 3) Modify the preliminary plat ATTACHMENTS: 1) Preliminary Plat 2) Site Plan 3) Landscape Plan hrtz. stf