Loading...
ST9502-CS 96020502/05/96 M0N 12:26 FAX 214 235 9544 Pacheco Koch Consult Eng COPPELL POLICE AND COURTS FACILITY TO~/N CENTER BOULEVARD EXTENSION CITY OF COPPELL, TEXAS Addendum No. 1 February 5, 1996 002 This Addendum consists of this sheet only and no attachments. The Drawings and Specifications dated 12/28/95 prepared by Pacheco Koch Consulting Engineers, Inc. for the extension of Town Center Boulevard are hereby amended in the following particulars and in these particulars only: Specification-~: Bidding and Contract Documents Section 1, Article 8, Item 8.1,is to be retrieved to read as follows: 8. Contract Time. 8.1 Because time is of the essence, the total time for completion in calendar days has been set at 150 calendar days. Also, because of the construction of the Coppell Criminal 1ustiee Center and the need to tie-in utilities, the water and sewer to service that facility shall be completed within the first 40 days of the project and the storm drainage to service the facility within the first 80 days. The calendar day count shall commence ten (10) calendar days after the date of the Notice to Proceed. NOTE: Any other items within the Drawings and Specifications pertaining to these dates are also hereby amended as listed above. END OF ADDENDUM 02/05/96 Pacheco Koch Consult Eng ~ 001 214 2~5 9544 M0N 12:25 FAX 214 235 9544 PACHECO KOCH Consulting Engineers; Inc. TELECOMMIYNICATIONS COyER LETTER Date: February S, 1996 PK No: 1484-95.089 To: Mr. Ken Griffin/Jim Ragsdill CITY OF COPPELL Department of Engineering (214) 304-3679 From: Randall P. Pogue Telefax Number: (214) 235-9544 Comments: Addendum No. 1 Coppoll Police and Courts Facility Town Center Boulevard:... Extension City of Coppell, Texas If you have any questions or need any additional information, please call me at your convenience. Total Number of Pages Transmitted (Including this cover letter): 2 * If You Do Not Receive All Pages, Please Call Us At Once At (214) 235-3031 * Operator: Laura 9401 LBJ Freeway * Suite 300 * Dallas, Texas 75243 * (214) 235-3031 7.1 7.2 8.2 8.3 10. 11. All questions about the meaning or intent of the Contract Documents are to be directed to the Purchasing Agent. Interpretations or clarifications considered necessary by the Purchasing Agent in response to such questions will be issued by Addenda mailed or delivered to all bidders recorded as having received the Bidding Documents. Questions received less than two days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Each Bidder shall acknowledge on the bid proposal that all Addenda issued have been received. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the Owner. Contract .Time. I~C} Bec se ' e is of the essence, the total time for completion in calendar days has 'been set completed within ~e t~ays of ~e project ~d ~e store draimge to se~ice ~e Prior to ~e issuance of~e NotiSd by ~;Owner, ~e Contractor shall submit a derailed Progress and Schedule cha~ to ~e Owner for approval. Extension of the contract time shall be based on a Change Order or written amendment as specified in Item 1.36 of the General Provisions. Liquidated Damages. Provisions for liquidated damages are set forth in the Contract. Liquidated damages for this project are: Two hundred forty dollars ($240.00) per calendar day. Substitute or "Or-Equal" Items. The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or-equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement. No substitutions should be considered during the bidding process. Subcontractors, Suppliers, and Others. Bidding and Contract Documents