Loading...
PA9901-LR010519A ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 Report (972) 620 -8911 Tested For: DEAN CONSTRUCTION ATTN: JUNE DAVIS 701 HALL CEDAR HILL, TX 75104 Fax Number: (972) 291 -7172 Project Desc: WAGON WHEEL PH. II COPPELL, TEXAS Our Report No.: 00931 -95 Issue Date: 05/19/2001 FIELD DATA Placement Location: PAVING, 3514 & 175 - E FROM THE SW CORNER OF THE PARKING LOT Date Placed: 4/19/01 Time Placed: 9:40 AM Slump (ASTM C -143): 5.0 Air Content: 4.0 (ASTM C -173) Air Temperature: 55 Specimen Temperature: 59 Date Received: 4/20/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: TERVEEN, JUSTIN Mix Data Submitted By: -MC Plant Number: 7 -5.0 sk Delivery Ticket No.: 7100489 Made By: ALPHA Cured Specification: ASTM C -31 CYLINDER COMPRESSION TEST RESULTS Notes: Our test results and reports are for the exclusive use of the Client (and their designated receplents on file In our office) and shall not be reproduced and /or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not IndlcaWe of the qualities of apparently Identical or similar specimens. Lab Cure No.: Type: Cap Spec: Date Tested: Age (Days): Avg. Length Avg. Width Avg Depth/ Diameter Area: Sq. In. Max Load: PSI: 249 LAB C -617 4126/01 7 12 N/A 6 28.27 68758 2430 250 LAB C -1231 5/17/01 28 12 N/A 6 28.27 118327 4180 251 LAB C -1231 5117101 28 12 N/A 6 28.27 122409 4320 252 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: Results to Date: - - — 28 Respectfully Submitted of Alpha Testing, Inc. A ALPHA TESTING INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 Report (972) 620 -8911 Tested For: DEAN CONSTRUCTION ATTN: JUNE DAVIS 701 HALL CEDAR HILL, TX 75104 Fax Number: (972) 291 -7172 Project Desc: WAGON WHEEL PH. II COPPELL, TEXAS Our Report No.: 00931 -92 Issue Date: 05/19/2001 FIELD DA Placement Location: SLAB; 30'S & 20'W FROM THE NE CORNER OF THE CONCESSION STAND Date Placed: 4117101 Time Placed: 10:30 AM Slump (ASTM C -143): 4 Air Content: N/A Air Temperature: 50 Specimen Temperature: 54 Date Received: 4/18/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: GARAY, ROBERT Mix Data Submitted By: LMC Plant Number: 6-5.0 SK Delivery Ticket No.: 6147842 Made By: ALPHA Cured Specification: ASTM C -31 CYLINDER COMPRESSION TEST RESULTS Lab Cure No.: Type: Cap Spec: Date Tested: Age (Days): Avg. Length Avg. Width Avg Depth/ Diameter Area: Sq. In. Max Load: PSI: 237 LAB C -617 4/24/01 7 12 N/A 6.01 28.36 75056 2640 238 LAB C -1231 5/15/01 28 12 N/A 6 28.27 91595 3240 239 LAB C -1231 5/15/01 28 12 N/A 6 28.27 97221 3430 240 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: Results to Date: 28 3000 PASS Notes: Respectfully Submitted of Alpha Testing, Inc. Our test results and reports are for the exclusive use of the Client (dd their designated receplents on Ole in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and /or observed, and are not Indicative of the qualities of apparently Identical or similar specimens. n e .,. a.:.. _M�leFt$jii6.s,tNjl §r EtvNO`a °• �....._,..,, .... _i,..,,...o. REPORT OF FIELD /i,, COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 9721620 -8911 - 9727263 -4937 (Metro) FAX: 9721406 -8023 TESTED FOR DEAN CONSTRUCTION CEDAR HILL, TEXAS DATE 05/19/01 PROJECT WAGON WHEEL PH. II COPPELL, TEXAS TFST IIATA' OUR REPORT NO. 00931 -106 TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT` 96 05/19/01 FG -3.0 2 19.5 101.5 22.3 100 98 1 -A 97 05/19/01 FG -3.0 2 19.5 101.5 23.0 98 97 1 -A TEST LOCATION: 96 STORM SEWER MAIN LINE F AT STATION #0 +70 97 STORM SEWER MAINLINE FAT STATION #0 +70 CC LARRY DAVIS, CITY OF COPPELL - LEE STONE, CITY OF COPPELL - BRAD REID, CIT OF CLINT WOLFORD, SCHRICKEL, ROLLINS, & ASSOC. 1. FILL A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ape Ily S 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENTTREATED D. RETEST ALP T IN Our test results & reports are for the I use of the Client (and their designated recipients on Ole in our office) and shall not he reproduced andlpr Olstrid ed I twit express ap or om name& test results must receive our written approval. Test results& reports apply only to the samples tested al observed. and are not Indicative oftheR litie fapparently ALPHA. The use or similar specimens. Geotechnical Engineering l Construction Materials Testing F^ Environmental Engineering / Consulting