Loading...
ST9401-CN 971014WIER & A._=,-cIFII31ATE-cI, INC. ENGINEERING SURVEYING LAND PLANNING October 14, 1997 Mr. Ken Griffin, P.E. Assistant City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: W&A #94-093; Denton Tap Road: Coppell, Texas Dear Mr. Griffin: We were recently contacted by Mr. Mike Martin of your office to provide a cost for engineering services to separate the Denton Tap Road project plans into two separate projects. The division separation for the two plans is the S.H. 121 Bypass. The City of Lewisville currently has Denton Tap Road north of S.H. 121 under contract and in construction. TxDOT has the S.H. 121 Bypass under construction. The contractor performing the City of Lewisville project may agree to add the work north of the S.H. 121 Bypass at the same unit costs. Completing the portion of the roadway north of the S.H. 121 Bypass will provide numerous benefits to traffic movement in the area. We anticipate the design fee to address the separation of the plans into two projects to be $12,000 which would include providing a mylar set of plan originals and a proposal structured after the Lewisville contract pay items. This letter proposal can become an amendment to the existing Engineering Services Contract (signed by the Mayor on January 16, 1995) upon signature of the approval blank provided below. Please contact me if you have any questions or comments regarding this proposal amendment. We appreciate the opportunity to provide professional services to the City of Coppell. Very truly yours, U~~LS. Accepted this le> dayof h~-Ce T,rLLeP y: (Signature) (Titl~ · -,<-,c,  Iress - ~tre~e) BELTWAY PLACE, ~LIITE 13[3 ,1997. Client: City of Coppell (Name - Please Print) 97 , 80,/-3 7q q7 3o'-/-35-7o (Phone) (Fax) e-mail to: president@wier*assoc,corn I'IIA MEMORANDUM TO: FROM: DATE: SUBJECT: Ken Griffin, City of Coppell Ulys Lane 10-14-97 W&A #94-093; Denton Tap Road; Coppell, Texas Attached is a letter proposal for an addendum to the existing Engineering Services Contract for the additional services we estimate to revise the construction plans into two plan sets. We are not clear on the amount of effort to address grading, landscaping and temporary control of access. The cost could be less depending on the items of work we will actually be required to perform. We can do this work at hourly reimbursable rates not to exceed $12,000.00 if you prefer,. I know the effort will be more than one would expect. Please call me if you want to discuss the fee or services. END OF MEMO 4300 Beltway Place, Suite 130 Arlington, Texas 76018 metro (817) 467-7700