Loading...
Summit P2-CS 980702 (2)DEVELOPMENT REVIEW CONMUTTEE ENGINEERING COMMENTS ITEM: Summit at the Springs Phase 1 Amending Pla t. to correct various bearings and dimensions located in Lots 6 through 12, 20, 21, and 25, Block B and Lots 1 through 7, 18, 19, 22, 23, Block C, for property located along the south side of Bethel Road, approximately 440 feet west of North Denton Tap Road, at the request ofDowdey, Anderson and Associates, Inc. DRC DATE: June 25, 1998 and July 2, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (304 -3679) COMMENTS Show radius dimension of Armstrong Blvd. cul-de -sac.