Loading...
ST9902-CS030909 I INC. s\ C{Q-02. TEAGUE NALL AND PERKINS 01'iV\c4\ lev\CL ENGINEERS ~ SURVEYORS ~ CONSULTANTS 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 (214) 461-9867 (214) 461-9864 FAX MEMORANDUM To: From: Date: Re: Ken Griffin, P.E., Suzan Taylor Jay VOlk, P.E. September 9, 2003 West Sandy Lake Road Project - Notes from 9-9-03 Meeting NOTE: FOLLOW-UP NOTES FROM THE MEETING ARE IN RED AND ITALICS. ATTENDANCE: Ken Griffin, P.E., Dir. of Engineering & Public Works - City of Coppell Suzan Taylor, C.I.P. Coordinator - City of Coppell Jay VOlk, FE. - TNP Dallas Office Matt Atkins, E.I.T. - TNP Dallas Office I. Existing Fire Hydrants in Median a. Remove all? b. Relocate? c. To which side of road? d. New Valves? We will relocate newer hydrants. Old hydrants will be removed and returned to the City. We will stub out 8-inch lines from the existing 10-inch line to undeveloped properties on North side of road. The City will confirm whether new valves will be added to leads that are extended to parkway areas. II. Minimum Cover Over Water Line a. 24-inch b. 12-inch/10-inch c. Under Pavement d. Non-Paved Areas (median) The minimum cover shall be 42-inches. In special cases, 36-inches may be considered. TNP will send draft plan/profile plots to city next week showing relationship between existing water lines and proposed finished grade. III. Tornado Siren It belongs to the City and will be relocated by our contractor. The likely new location will be northwest corner of Sandy Lake and Coppell Road North adjacent to the Brazos Electric facility. The City will confirm with the fire department that this location will be acceptable. Page 1012 IV. Detention for Undeveloped Properties Detention for undeveloped properties will not be required. V. Trail Along Church Property The City will approach the Church about granting a 10-foot sidewalk and utility easement to permit the trail to meander and not overlap proposed curb inlets. TNP will prepare the documents. VI. Fire Department Approval of Traffic Control Plan Coordination with the fire department will be handled in-house by the City. TNP shall prepare a letter to Mr. Griffin advising him as to how long Coppell Road North would be completely closed to all traffic if Contactor was permitted to close the road to construct new improvements. We will likely specify high early strength concrete and try to schedule this work during the summer months. VII. Contractor Issues - The City will provide TNP current specs that cover many of the issues listed below. a. Construction Water - Contractor's expense. He will need to obtain a construction meter from the City and pay for water. b. Staking - Contractor's expense. We will provide control points only. c. SWPPP - Contractor's expense and responsibility to prepare and maintain. d. Batch Plant - Contractor will be responsible for all state permits. If the plant will be in place for more than 90 days, an SUP is required. Mr. Griffin will handle obtaining the SUP on Contractor's behalf e. Testing - The lab will be hired by the City and the City will control all testing activities. f. Pre-Bid Conference - Will not be mandatory, but strongly encouraged. VIII. Next Meeting October 28, 2003 at 9:00 am at the City offices. Page 2 012