Loading...
ST0301-UP030915FREES EoNICHOI.8 1701 N. Market St., Suite 500 Dallas, TX 75202-2001 Phone: (214) 920-2500 Fax: (214) 920-2565 www.freese.com ProJect Number: CPL03243 TO: FROM: DATE: RE: CC: Ken Griffin, P.E., Suzan Taylor Chris Moorman, Tricia Hatley, P.E. September 15, 2003 Bethel Road Construction Project Updates: [] Attended Public Meeting for conceptual designs on Sept. 8, 2003. Continuing hydraulic study on existing bridge to determine new bridge elevations. [] Bridge design waiting on ultimate hydraulic study findings. [] Have contacted Transystems to coordinate/share information. Tasks and deliverables for the next two weeks: [] [] Date: Sept. 15 Sept. 23 Deliverable: Conceptual Plan Submittal Review Meeting Additional Issues: We are trying to set up a meeting with Transystems to discuss coordination on the following items: [] Vertical Datum L1 Existing Right-of-Way Proposed easements and Right-of-Way [] Drainage design After repeated requests for meetings and copies of plans from Transystems, we have received nothing to date. [] Will Mr. Griffin take/present Conceptual Plans to the City Council? If so, when? Project Schedule Revised as of 9/15/03 City of Coppell Bethel Road ask Name Durat on S art F n sh 2004 2005 ~ ~ Jua A~ ~ ~ Nov D~ F~b ~ ~p~ ~ ~ ~ep Oc~ ~ov D~ ~rt ~eb ~ Apr M~ J~n J~ ~ O~i Nov D~c Jan Feb Mar Apr May Jun Ju Aug Sep Oct Nov Dec 3ck-offmeeting 0 days Tue 6/3/03 Tue 6/3/03 :onceptual Design 3 mons Tue 6/3103 Mon 8/25103 6/3 $125 'roject Team Meeting 0 days Thu 8/21/03 Tha 8/21/03 8121 ~ublic Meeting I day Mon 9~8~03 Mort 9~8/03 )esign Survey 30 days Tue 6/3~03 Mon 7/14/03 6/3 7/14 :oncept Plan Submittal 0 days Mon 9/15/03 Mon 9/15t03 :ity Review ~eview Meeting ~eotechnical Investigation ~reliminar,j Design ~reliminary Plan Submittal ;ity Review ~eview Meeting ~ublic Meeting 4 days Tue 9/16/03 Fri 9/19/03 1 day Tue 9/23/03 Tue 9/23/03 4 wks Wed 9/24~03 Tue 10/21/03 5 mons Thu 10/16/03 Wed 3/3/04 0 days Wed 3~3~04 Wed 3/3/04 3 wks Thu 3/4/04 Wed 3/24/04 0 days Wed 3124/04 Wed 3/24/04 0 days Wed 3/31/04 Wed 3/31/04 :inal Design 4 mons Thu 411104 )0% Plan Submittal 0 days Wed 7/21/04 Wed 7/21/04 4/1 Wed 7/21/04 7/21 .~ity Review 3 wks Thu 7/22104 ~eview Meeting 0 days Wed 8/11104 :inal Plan Submittal 3 wks Thu 8/12/04 Wed 8111/04 Wed 8/11/04 7~22 Wed 9/1/04 8/12 6 wks Mon 4/25/05 ~ublic Meeting 0 days Fd 6~3/05 Construction 18 mons Mon 6/6/05 Fd 6/3/05 ; 4)25 ~6i3 Page 1