ST0301-UP030903FR E ES EoNICHOL8
1701 N. Market St., Suite 500
Dallas, TX 75202-2001
Phone: (214) 920-2500
Fax: (214) 920-2565
www.freese.com
Project Number: CPL03243
TO:
FROM:
DATE:
RE:
CC:
Ken Griffin, P.E., Suzan Taylor
Tricia Hatley, P.E., Chris Moorman
September 3, 2003
Bethel Road Construction
Project Updates:
Received copies of plans for existing water lines and structural details for the bridge parapet walls
Received electronic files of HEC model for Grapevine Creek Bridge.
Began hydraulic analysis on bridge.
Contacted Transystems to coordinate improvements between the two projects.
Tasks and deliverables for the next two weeks:
Public Meeting to gather public input.
! Conceptual Plan submittal to City.
Date:
Sept. 8
Sept. 15
Deliverable:
Public Meeting
Conceptual Plan Submittal
Additional Issues:
We are trying to set up a meeting with Transystems to discuss coordination on the following items:
Vertical Datum
Existing Right-of-Way
Proposed easements and Right-of-Way
Drainage design
DTO'~ oI
Exhibit C
Project Schedule
City of Coppell
Bethel Road
2006
Task Name 2004 ~ 20?.5
Pubflc M~ting ~ ~8125 ............
g y 613 i'::'"::l ~14
Concept Plan SubmiEal ' ' '~911~ '
Review Meeting
Geotechnical Investigauon
9~23 I 10120
Preliminary Design 9123
Preliminary Plan Submittal
City Review 3/9
Review Meeting
Public Meeting i ........... ~ ~. ...........
Final Design ...............
90% >/an Sul~r~ittal ' ;; ......... ~126 .......... _
City Review ';: ...... 712~. i~116 ....... '
Construction ....... 81~ '~~k~%%%~ 10120
Page 1