Loading...
CF-Denton Creek Trail-CS030924T H E C I T Y O F COPPELL ~~ T o F ~, A S l g 9 MEMORANDUM ~~` o'' ~ ~~~I p ~~ ~~ FROM THE DEPARTMENT OF ENGINEERING To: John Elias, Park Planner/Landscape Manager ,( From: Teresa Turner, E.I.T., Graduate Engineer '\ Date: September 24, 2003 RE: Denton Creek/Asbury Manor Hike and Bike Trail Staff does not have any major issues with the final plans as submitted. Please forward the following additional requirements/comments to the design engineer and contractor: 1. All construction must conform to the City of Coppell's Subdivision Ordnance and Construction Specifications. The contractor is required to have a copy of the City's Construction Details on the job site at all times. Copies can be purchased the in engineering office. 2. The appropriate erosion control measures must be in place at all times until vegetation is established. Questions pertaining to the Phase II Stormwater Pollution Prevention Program should be directed to Suzan Taylor, CII' Coordinator, at 972-304-7019. 3. Arrange apre-construction meeting with the inspector prior to beginning the project. Call Rhonda Brothers at 972-304-3682 for scheduling. 4. Keep the engineering inspector informed of any proposed changes to the signed plans prior to the changes taking place. 5. Provide the engineering department a copy of the record drawings at the completion of the project. Questions can be address by the Engineering Technician, Scott Latta, at 972-304-3683. CC: Inspectors Project File "CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"