Loading...
ST9902-CS030925 T H l~ C I T Y 0 Ie COI:3F-ELL P.O. Box 478 2S§ Parkway Bird Phone: (972)304-3679 Fax: (972)304-7041 ENGINEERING DEPARTMENT FAX COVER SHEET To: Ali Malekouti From: Suzan Taylor Fax: 214-653-6416 % 0~. '~ Date= September 25, 2003 Project: Sandy Lake Road ST I~ Pages: 5 (including cover sheet) Re: Major Capital Imp. Program cc: [] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested -Comments: As per your request, the information regarding Sandy Lake Road. I do not see that the City has executed any kind of interlocal or master agreement on the project. David McSwain did not think that it would not be a problem to use all or a portion of the funding on Section "A" and requested us to write Mr. Holzworth. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 ~ ofCoppell Eng neertng- Excellence By Destgn T H E · C I T Y 0 F COppELL February 5, 2003 e^ s x is '~ Mr. Donald R. Holzwarth, P.E. Director of Public Works / Dallas County Public Works 411 Elm Street, 4th floor Dallas, Texas 75202 Sandy Lake Road / ST 99-02 A&B Major Capital Improvement Program Dear Mr. Holzwarth: In October 2000, the Sandy Lake Road (Denton Tap to SH 121) widening project was approved for cost pamcipation funding through the Major Capital Development Fund. County funds in the amount of $1,300,000 are available to the City in Program Year 2006. The funds are dedicated solely to the construction of the roadv~ay improvements. The west section of Sandy Lake Road, from SH 121 to north Coppell Road, is mostly developed with commercial/industrial facilities and there are no issues that adversely affect the construction of that section of roadway. The east section of roadway, from north Coppell Road to Denton Tap, ~s almost completely developed with residential subdivisxons. There are numerous issues that affect the construction, including tree removal, right-of-way acquisition, existing ~rrigat~on and landscaping, and the relocation of four of the smaller Oncor electric transmission lines. The City's design consultant, Teague Nail and Perkins, Inc., *~as instructed to prepare the constructmn plans in two secnons. Section "A" begins at SH 121 and ends at Freeport Parkway and Section "B" begins at Freeport Parkway and ends at Denton Tap. This will allow the City to start construction of Section "A" at an earlier date. This section of Sandy Lake Road provides commercial traffic access to the commercial/industrial facilities located along Royal Lane, Sandy Lake, and Freeport Parkway. Construction of Section "A" is scheduled to start in June 2004 and has an estimated construction cost of $3,250,000. Constructmn of Section "B" is scheduled to start m June 2007 and has an estimated construction cost of $4,000,000. Plans are currently in the schematic design phase. The City has met with David McSwain several times regarding this project and he is aware that we intend to construct the project in two sections. The project scope items for both sections of the roadway have been submitted to him. Since the Sandy Lake Road project was submitted to the County as one project, we are requesttng consideration of the County moving ail or a portion of the SI,300,000 forward for the City's use on the construction of Section "A". We are available to discuss any options for the funding at your convemence. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please contact mc at 972-304-70t9. Sincerely, rdinator CITY OF COPPELL 1999 BOND PROGRAM FOR 1999 TO 2007 PURPOSE OF BONDS PARKS AND QUALITY OF LIFE MACARTUR PARK DEVELOPMENT WAGON WHEEL DEVELOPMENT ANDY BROWN EAST ATH DEV EXTENSION OF TRAILS IN N ZONE SENIOR CITIZEN CENTER TENNIS CENTER TOWN CENTER MASTER PLAN RENOVATION OF GRAPEVINE SPRINGS TOTAL FOR PARKS AND QUALITY OF LIFE STREET PROJECTS WEST SANDY LAKE ROAD EAST SANDY LAKE ROAD BETHEL ROAD [ BETHEL ROAD II COPPELL ROAD CREEKV[EW DRIVE FREEPORT PARKWAY TOTAL FOR STREET PROJECTS DRAINAGE PROJECTS VARIOUS DRAINAGE PROJECTS TOTAL FOR DRAINAGE PROJECTS PROGRAM TOTAL ANNUAL BUDGET AMOUNT PRIOR REMAINING AMOUNT AMOUNTS TO BE PROPOSED AMOUNT TO BE ISSUED IN VOTED ISSUED ISSUED JUNE 03 JUNE 04 JUNE 05 JUNE 06 JUNE 07 8,275,000 1.025,000 7,250,000 3,250,000 4,000,000 4,000,000 4.000,000 0 9,500,000 750,000 8,750.000 8,750,000 2,600,000 420,000 2.180.000 2,180,000 2,630,000 230,000 2,400,000 2,400,000 1,780,000 1,780.000 0 1,560.000 895.000 665,000 665,000 30,345.000 9.100,000 21,245,000 8,750,000 5.430,000 2,400,000 4,000,000 668,000 1,700.000 295,000 1,405,000 405,000 1,000.000 1.700,000 295,000 1,405.000 0 405,000 1.000,O00 0 0 40,730,000 15,600,000 25.130,000 8,750.000 6,115,000 3.400,000 4,100,000 2.765,000 CITY OF COPPELL 231 1,000,000 1,000,000 0 3,000,000 3,000,000 0 500.000 500.000 0 920,000 920,000 0 1.200,000 1.200,000 100.000 1.100,000 785,000 785,000 0 1,000,000 1,000,000 280.000 280.000 280,000 1,000,000 8,685,000 6,205,000 2,480,000 0 280.000 0 100,000 2.100~000 T H IE C I T Y 0 F COPPELL February 5, 2003 Mr. David McSwain Dallas County Public Works 41l Elm Street, Suite 400 Dallas, Texas 75202 Sandy Lake Road ST 99-02 A&B Major Capital Improvement Program - Project Scope Items Dear Mr. McSwain: As required for the Major Capital Improvement Program, enclosed are the Project Scope Items for Section "A" and Section "B" of Sandy Lake Road. Section "A" is scheduled to start in June 2004 and has an estimated construction cost of $3,250,000. Construction of Section "B" is scheduled to start in June 2007 and has an estimated construction cost of $4,000,000. I have sent a letter to Mr. Donald Holzwarth requesting consideration of moving ali or a portion of the $1,300,000 forward for construction of Section "A". Should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, Suz~)2. Taylor C.I.P. Coordinator Enclosures CITY MAP O! I 2 3 ~ S NISH VA* ~ ~ PROJECT SCOPE ITEMS SANDY LAKE - FREEPORT PARKWAY TO DENTON TAP ST 99-02B PAVEMENT AND ALIGNMENT TOPICS PAVEMENT SECTION PAVING DESIGN CRITERIA City of Coppell Construction Design Standards & North Central Texas Council of Governments Standard Specifications for Public Works Construction ROW WIDTH: Existing: Varies from 55' to 120' Proposed: 90' minimum PAVEMENT WIDTH: Existing: 24' Proposed: 2 27' back to back No. of lanes proposed: 4 lanes PARKWAY: Proposed Width: Varies- 10' minimum Proposed Sidewalk Width: Sidewalks are 5' & hike and bike trail is 10' Parkway cross fall slope maximum: 3"/fi. GRADE REQUIREMENTS: Is TC below adjacent ground criteria to be followed? N_po Any deep cuts, high fills? Yes PAVEMENT CROSS FALL: PROPOSED: ¼"/ft. MINIMUM: ¼"/fl. MAXIMUM: ¼"/ft. PROJECT SCOPE ITEMS Sandy Lake - Freeport Pkwy To Denton Tap (ST 99-02B) VERTICAL GRADE: MiNiMUM: 0.5% MAXIMUM: 5.13% CENTERLiNE ALIGNMENT POSITION: iN CENTER OF EXISTiNG ROW? No OFFSET FROM CENTER: Varies ON BRAND NEW ALIGNMENT? N~o LEFT TURN LANES: 15 left turn lanes MiNIMUM LENGTH: 155.5' MiNIMUM STORAGE: 60' WIDTH: 10' ANY DUAL LEFT TURN LANES? ANY FREE RIGHT TURN LANES? YES NO YES NO X One (&~ Denton Tap CRASH CUSHIONS/ATTENTUATORSINVOLVED YES NO X RAILROAD CROSSiNGS INVOLVED YES NO X NOTE: IF CURRENT CROSSiNG IS NOT USED, IS ABANDONMENT AN OPTION? YES NO PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkway To Denton Tap (ST 99-02B) PAVEMENT STRUCTURE DESIGN WHEEL LOAD: 18 kip single axle load BUS AND HEAVY TRAFFIC: YES X NO ROADWAY CLASSIFICATION: Maior arterial MINIMUM PAVEMENT STRUCTURE THICKNESS: 8'- MINIMUM PAVEMENT BASE OR SUBGRADE THICKNESS: 8'~' DESIGN SPEED: Coppell Road South Intersection) POSTED: 35 MPH MEDIANS MEDIAN WiDTH: 16~' ANY MID BLOCK OPENINGS TO CONSiDER? 50 MPH (40 MPH (~ CoppelI Road North Intersection & 45 MPH ~ ANY SIDE STREETS TOO CLOSE FOR OPENING? (Branchwood Drive & Georgian Lane) STANDARD TURN LANE WIDTH: STANDARD NOSE WIDTH: 6-- YES NO 1 i' min. & 12' max. YES NO X X PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkway To Denton Tap (ST 99-02B) DRIVEWAYS: MAXIMUM RESDENTIAL GRADE: V4"/ft. MAXIMUM COMMERCIAL GRADE: ¼"/ft: MiNIMUM COMMERCIAL DRIVEWAY WIDTH: 20' / 15' one wa,/ SIDE STREET CONSIDERATIONS TURNiNG RADiUS, MiNIMUM: PAVEMENT THICKNESS: 8'_~' 35' major / 25' residential and minor Streets COMMERCIAL DRIVEWAY THICKNESS: 6-- DRAINAGE TOPICS STORM SEWER DESIGN CRITERIA: TxDOT CITY City of Dallas Drainage Desi~ Criteria HYDRO-35 X TP-40 1NLET DEPTHS (APPROPRIATE FOR PAVEMENT THICKNESS) 4 ½' MINIMUM COVER LATERALS 2' below subgrade BRIDGES/BOX CULVERTS iNVOLVED YES X NO 100 YEAR FLOOD PLAIN CONSIDERATION yes / 2 FT FREEBOARD 4 PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkway To Denton Tap (ST 99-02B) PERMITS COE 404 PERMITS NEEDED YES ma? be required because of the creek crossing and construction of new bridge NO TNRCC 401 PERMIT YES may be required as part of 404 NO CDC PERMIT YES NO X ADA PERMIT YES X (If> $50,000 of pedestrian facilities) NO ANY OTHER PERMITS FROM OTHER AGENCIES SUCH AS TxDOT, DFW, AIRPORT, DART, ETC? YES (Plans will be submitted to the Texas Historical Commission ma,/need permit if it is determined that any archaeological sites are in the vicinity of the project ) NO UTILITIES LIST OF ALL KNOWN UTILITES: 1. Southwestern Bell 2. Oncor Gas & Electric 3. Verizon 4. AT&T Broadband 5. Metromedia Fiber Network 6. Touch America DOCUMENT KNOWN RISKS ( TRA lines, Transmission Towers, Lone Star Gas Valve Stations) FOR OUR UTILITY PARTNERS: Oncor transmission towers - street alignment moved to south to miss large towers ARE UTILITIES ON EXISTiNG STREET R.O.W.? Yes DO UTILITIES OWN THEIR R.O.W. OR HAVE PREVIOUS EASEMENTS? Oncor has 40' utility easement HAS WORK ORDER BEEN ISSUED FOR SUE (Subsurface Utility Engineering)? No ANY SPECIAL CONSIDERATIONS? No PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkway To Denton Tap (ST 99-02B) R-O~W ACQUISITION RIGHT- OF- WAY CONSTRAINTS, IF ANY, PROVIDE A LIST AND DESCRIPTION ALONG WITH DATA FOR RISK ASSESSMENT: Many of the newer residential developments have dedicated right-of-way to accommodate the roadway widening. In addition, they have utility, landscape, and open space easements established beyond the right-of-way dedication. In the case of most older subdivisions, individual properties, and undeveloped tracts, the existing right-of-way is not sufficient for the proposed widening. There does not appear to be any right-of-way constraints. ANY NON-ROUTINE, i.e., CEMETARY, JUNK YARD, OLD CHURCHES, SERVICE STATIONS, CONTAMINATED SOILS, LANDFILLS, NOISE WALL CONSIDERATIONS, TRAILER PARKS, TREE ORDINANCES? YES ANY NON-CONFORMING ISSUES? R-O-W MAP NEEDED YES NO X FIELD NOTES NEEDED R-O-W PLATS NEEDED RELOCATION ASSISTANCE INVOLVED PARKING/LOSS OF PARKING CONSIDERATIONS HISTORICAL SITE CONSIDERATION NO X YES Completed NO YES Completed NO YES X NO YES NO X YES NO X YES NO X 6 PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkway To Denton Tap (ST 99-02B) USUAL CITY TOPICS OF CONCERN DESIGN STANDARDS TO BE USED? City o£Copp¢ll Design Standards & NCTCOG ORDER OF PRECEDENCE OF STANDARDS. City of Coppell Design Standards & NCTCOG AUXILIARY LANES? None PROVISIONS FOR FUTURE WIDENING? N~o LANDSCAPING? Under separate contract - Parks and Recreation Department EXPOSED AGGREGATE DRiVEWAYS, SIDEWALKS? No STAMPED/COLORED CONCRETE? Yes IRRIGATION? Yes BRICK PAVERS? Yes STREET LIGHTING? Streetlights will be placed in the median. Installation of the foundations and conduit are included as part of the construction. Oncor will perform the actual streetlight installation. TRAFFIC SIGNALS? At the Coppell Road North and Coppell Road South intersections PAVEMENT MARKINGS? Yes BIKE LANES (EXTRA WIDTH)'? Outer lane is 14.5' & a separate i0' hike & bike trail NEW SIDEWALKS? Yes DART BUS TURNOUTS? No BUS STOPS OR BUS SHELTERS? No WATER UTILITY BETTERMENTS? No WATER UTILITY RELOC.? Yes SAN. SEWER BETTERMENTS? No SAN. SEWER RELOC.? Yes PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkw¥ To Denton Tap (ST 99-02B) RETAINING WALLS? Proposed decorative stacked-block retaining wall system (STONE, BLOCKS, GABIONS, PROPRIETARY TYPES) SOD, SEEDING, TOPSOIL? Yes DRAINAGE IMPROVEMENTS? Enclosed drainage system improvements & bridge RR CROSSING IMPROVEMENTS? N~o GRADE SEPARATIONS? N~o RAMPS OR CONNECTORS TO TxDOT FACILITIES? N_9_o SPECIAL SCHOOL OR EMERGENCY VEHICLE CONSIDERATIONS ANY NEARBY OR ADJACENT SCHOOLS, CITY HALL, FIRE OR POLICE DEPARTMENT REQUIRING SPECIAL CONSIDERATION? N~o PUBLIC INVOLVEMENT CITY COUNCIL APPROVAL OF ALIGNMENT, REQUIRED'? approval of preliminary plans and award of construction contract YES NO X HAVE ALL NEIGHBOR GROUPS PROVIDED EARLY iNPUT? YES proiect will be broken into two sections, Freeport Pkwy. To Coppell Road, and Coppell Road to Denton Tap - citizen input will be solicited NO X for the Coppell Road to Denton Tap section NEIGHBORHOOD MEET1NGS REQUIRED? not required, but will be conducted YES NO X IF REQUIRED WHO CONDUCTS, CITY OR COUNTY? City DOCUMENT POTENTIAL SITES FOR PUBLIC AND OR NEIGHBORHOOD MEETINGS. The meetings will be conducted at City Hall, located at 255 Parkway Boulevard PROJECT SCOPE ITEMS Sandy Lake - Freeport Parkway To Denton Tap (ST 99-02B) CONSTRUCTIBILITY REPORT FROM INSPECTION STAFF, DOCUMENT ANY AND ALL ISSUES THAT MAY AFFECT PROJECT SCOPE, BUDGET, CONSTRUCTIBILITY, THE PROJECT SCHEDULE AND/OR THE SAFETY OF PROJECT. The east half of West Sandy Lake Road, from Freeport Parkway to Denton Tap Road is almost completely developed with residential subdivisions. Right-of-way will be required on both sides of the existing roadway. The existing irrigation and landscaping adjacent to the right-of-way, and currently maintained by an HOA, is an issue that will have to be addressed. Four of the smaller Oncor electric transmission poles will need to be relocated. They are located within an exclusive Oncor easement and the relocation will be an expense of the City. There are overhead power lines on the south side of Sandy Lake and five buried power line crossing that will need to be relocated. There is an overhead power line on the north side of the roadway that will need to be relocated. There are several buried lines that feed off of this line that will need to be evaluated. There is a high-pressure 24-inch gas line that crosses the roadway that may require lowering. There are gas distribution lines on both the north and south sides of the roadway that will need to be relocated. Access across construction areas will need to be provided throughout all phases of construction. Temporary pavement will be needed to accommodate construction and allow the existing roadway to remain in use. Most intersections will need to be constructed in phases to facilitate continuous access to and from Sandy Lake Road. Access to private drives will also have to be maintained. The interconnect system of the proposed traffic signals will need to be addressed. Tree removal from Coppell Road to Denton Tap will be a major issue. 9