Loading...
Gateway BP(2.3)-CS030926September 26, 2003 Terrance Wright Wright Group 1 110 S. Elm Street Carrolton, Texas 75006 RE: Gateway Business Park No. 2, Lot 1R1 Parking Lot Expansion 555 Dividend Drive If you have any questions, please contact me. Sincerely, Teresa M. Turner, E.I.T. Graduate Engineer tturner(cki.coppell.tx.us Office (972) 304 -3681 Fax (972) 304-3570 Attachment 1-aou- o COPPELL 4 tf a k A T H E •C 1 T V 2R1 0 F Dear Mr. Wright: It has come to our attention that construction on the parking lot expansion has begun without the issuance of any city approved permits. All construction activities must cease until the proper approvals have been obtained. The plans submitted to the Engineering Department on September 9, 2003 have been reviewed and will be approved subject to the following conditions: 1. A completed Construction Development Permit Application must be submitted for approval. I have attached a copy for your use. 2. Submit copies of the plans for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with the City's Standard Construction Details. 3. All fees must be paid prior to release of this project for construction. These fees consist of construction inspection fees to be paid to this office. The City assesses a 2% inspection fee for all private construction and 4% for public installations. 4. A pre construction meeting must be held. Please contact Rhonda Brothers at 972- 304 -3682 to schedule the meeting. CC'- Plannu ',car)/ bovvic Th ck TE 255 PARKWAY P.O. BOX 9479 COPPELL TX 75019 TEL 972/452 0022 FAX 972/304 3673