Gateway BP(1.2)-CS030904DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gateway Business Park, Lot 1,Block 1, Site Plan Amendment (UPS
Supply Chain Solutions), to amend the Site Plan to allow for two guard
shacks and perimeter chain -link security fencing, with landscaping, on 17.8
acres of property located at 660 Fritz Drive, at the request of Sheri Ablett,
Abstract Construction.
STAFF REP: Gary Sieb PROJECT ID# SPR -03 -0064
DRC DATE: August 28, 2003 and September 4, 2003
CONTACT: Teresa M. Turner, ELT., Graduate Engineer (972)304 -3681
COMMENT STATUS:
PRELIMINARY
✓FINAL
REVISED
AFTER P&Z
No comments.