Loading...
Braewood-CS030820ADVANCED - PAVING C0~ PROFESSIONALS IN PAVING CONSTRUCTION & REPAIRS 8/20/2003 Proposal Submitted To Michael Herchman Eagle Equity Management 5430 LBJ Freeway Dallas, TX 75240 Phone: 972-770-2257 Fax: 972-770-2210 We hereby submit specifications and estimates for: Job Name 8 Location: Braewood Shopping Center 150 Denton Tap Road Coppell, TX Phone: 817-475-4749 Asphalt Removal -Install Concrete: 2,226 Square Feet 1. Saw cut edges as needed, excavate to a depth of 6". 2. Fine grade sub-base. 3. Dowel 3/8" rebar into existing concrete on 18" centers. 4. Install 3/8" rebar on 18" centers. 5. Pour 6" of 3,500 PSI concrete, light broom finish. 6. Cut control joints on a 20' grid. 7. Area will be barricaded from 3 to 7 days to complete work and allow curing time. 8. Remove all related construction debris. 9. One year warranty. Curb & Gutter Repair: 3 Linear Feet 1. Remove the existing curb and gutter. 2. Replace to match the existing. 3. Concrete shall be 3,500 PSI, 5 sacks of cement per cubic yard, reinforced with two # 3 rebars, continuous. 4. Expansion joints will be placed at 200 foot maximum intervals, and at intersection, returns and other rigid structures. 5. One year warranty. TOTAL $7,801.00 TAX $565.57 GRAND TOTAL $8,366.57 Note: Anv permit fees required by the city are to be obtained and paid by the customer. Advanced Paving Company proposes to furnish all labor, equipment and materials -complete in accordance with above specifications for the sum of: Eight Thousand Three Hundred Sixty Six Dollars and 57/100 Payment due upon completion. $8,366.57 22571oe Field Rd. • Dallas, Texas 75229 • Dallas (972) 245-0000 • Fax (972) 247-2011 • Ft. Worth (817) 921-5642 Page 1 Toll Free (877) 853-1333 advancedpavingco.com