Loading...
Sandy Lake Med-CS030930T H E C I T Y - O F O\X To: P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3681 Fax: (972)304 -3570 ENGINEERING DEPARTMENT FAX COVER SHEET Travis Attanasio From: Teresa Tumer Fax: (214) 824 -7064 Date: 9/30/2003 Phone: Pages: 11 (including this sheet) Re: Sandv Lake Plaza Medical Building CC: ❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply ❑ As Requested Travis: Please see the attached information: • Conditional letter of approval for the plan set (one page) • Revised assessment fee calculations (five pages) • Construction Development Permit Application (three pages) • Construction Site Notice (one page) If you have any questions, please contact me at 972 - 304 -3681. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (9 72) 304 -3679 "City of Coppell Engineering— Excellence By Design" T H E C I T Y O F QQ E q X A A k 8 September 30, 2003 Travis Attanasio, Graduate Engineer Brockette- Davis - Drake, Inc. 4144 North Central Expressway, Suite 1100 Dallas, TX 75204 RE: Sandy Lake Plaza Medical Building Addition, Lot 1, Block 1 Construction Plan Review Comments Dear Mr. Attanasio: The City of Coppell has reviewed the revised plans for the referenced addition and with the following conditions, the plans will be approved. Sheet C5 - 1. Due to safety concerns, the contractor must provide the construction entrance on Moore Road. This will need to be shown on the final approved plans. 2. The contractor will need to provide a copy of the completed Construction Site Notice at the pre - construction meeting. I have attached a copy of the permit for your use. Please submit revised copies for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of impact and construction inspection fees to be paid to this office as requested in the revised Fee Assessment Letter dated September 30, 2003. The City assesses a 2% inspection fee for all private construction and 4% for public installations. If you have any questions or need any additional information, please contact this office at your convenience. Sincerely, \JJ4?�_Quyndr Teresa Turner, E.I.T. Graduate Engineer ttumer(aJ),ci.co pell.tx.us Office Phone: (972) 304 -3681 Fax: (972) 304-3570 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E - C I T V - O F COPPELL A � � September 30, 2003 Travis Attanasio, Graduate Engineer Brockette- Davis - Drake, Inc. 4144 North Central Expressway, Suite 1100 Dallas, TX 75204 RE: Sandy Lake Plaza Medical Addition Fee Assessment Letter -REVISED Dear Mr. Attanasio: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $35,910.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre - construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, 6faix �Aomr Teresa M. Turner, E.I.T. Graduate Engineer cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation 255 PARKWAY * P.O. BOX 947B * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Sandy Lake Plaza Medical Building, Lot 1, Block I -REVISED Date: 913012003 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,180.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $188.48 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,338.23 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,240.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $35,910.00 $35,910.00 '(100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prio to Start of Constru ction) TOTAL $45,196.71 :$:35,9:100]0 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL DEVELOPMENT FEE WORKSHEET PROJECT: Sandy Lake Plaza Medical Building, Lot], Block I -REVISED DATE: 913012003 Water Impact Fee: Domestic Meter(s): Irrigation Meter($): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 1 - 6 inch = 2.5 ESU's Total #: 18.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $188.48 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation /Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $5,180.00 $150.00 $188.48 $188.48 $188.48 $0.00 $0.00 $1,149.75 $1,149.75 $30.00 Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $280.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $60.00 $2,240.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 Single- family @ $0.00 per lot 0 Multi- family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right -of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0.00 $0.00 $35,910.00 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Sandy Lake Plaza Medical Building, Lot 1, Block 1 - REVISED DATE: 913012003 ROADWAY IMPACT FEE: Service Area * 6 Category ** Office Land Use ** General Office Bldg. Building Area (sf) 30,000 Development Units ** 30.00 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile * ** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $35,910.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - Roadway Impact Fee Study) Teresa Turner Re Sandy Lake Plaza Medical Office Building Page 1 From: "Travis Attanasio" <TAttanasio @bddeng.com> To: <tturner @ci.coppell.tx.us> Date: 9/30/03 4:47:26 PM Subject: "Re: Sandy Lake Plaza Medical Office Building I received them all Thank you >>> "Teresa Turner" <tturner @ci.coppell.tx.us> 09/30/03 04:40PM >>> Travis: I just sent you an 11 page fax. Please let me know if you did not received all pages or if you have any questions. Thanks. Teresa Turner City of Coppell Engineering Department 972 - 304 -3681